Laserfiche WebLink
POLICY NUMBER:ENV562000363-00 COMMERCIAL GENERAL LIABILITY <br /> CG 25 03 03 97 <br /> THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br /> DESIGNATED CONSTRUCTION PROJECT(S) <br /> GENERAL AGGREGATE LIMIT <br /> This endorsement modifies insurance provided under the following: <br /> COMMERCIAL GENERAL LIABILITY COVERAGE PART <br /> SCHEDULE <br /> Designated Construction Projects: <br /> Each project for which you have agreed, in a written contract which is in effect during the policy <br /> period, to provide a separate general aggregate limit, provided that the contract is signed and <br /> executed prior to any loss for which coverage is sought. <br /> (If no entry appears above, information required to complete this endorsement will be shown in the Declarations <br /> as applicable to this endorsement.) <br /> A. For all sums which the insured becomes legally 4. The limits shown in the Declarations for Each <br /> obligated to pay as damages caused by Occurrence, Fire Damage and Medical Ex- <br /> "occurrences" under COVERAGE A (SECTION pense continue to apply. However, instead of <br /> I), and for all medical expenses caused by acci- being subject to the General Aggregate Limit <br /> dents under COVERAGE C (SECTION I), which shown in the Declarations, such limits will be <br /> can be attributed only to ongoing operations at a subject to the applicable Designated Con- <br /> single designated construction project shown in struction Project General Aggregate Limit. <br /> the Schedule above: B. For all sums which the insured becomes legally <br /> 1. A separate Designated Construction Project obligated to pay as damages caused by <br /> General Aggregate Limit applies to each "occurrences" under COVERAGE A (SECTION <br /> designated construction project, and that limit I), and for all medical expenses caused by acci- <br /> is equal to the amount of the General Aggre- dents under COVERAGE C (SECTION I), which <br /> gate Limit shown in the Declarations. cannot be attributed only to ongoing operations <br /> 2. The Designated Construction Project General at a single designated construction project shown <br /> Aggregate Limit is the most we will pay for in the Schedule above: <br /> the sum of all damages under COVERAGE 1. Any payments made under COVERAGE A <br /> A, except damages because of "bodily injury" for damages or under COVERAGE C for <br /> or "property damage" included in the medical expenses shall reduce the amount <br /> "products-completed operations hazard", and available under the General Aggregate Limit <br /> for medical expenses under COVERAGE C or the Products-Completed Operations Ag- <br /> regardless of the number of: gregate Limit, whichever is applicable; and <br /> a. Insureds; 2. Such payments shall not reduce any Desig- <br /> b. Claims made or"suits" brought; or nated Construction Project General Aggre- <br /> gate Limit. <br /> c. Persons or organizations making claims <br /> or bringing"suits". C. When coverage for liability arising out of the <br /> "products-completed operations hazard" is pro- <br /> 3. Any payments made under COVERAGE A vided, any payments for damages because of <br /> for damages or under COVERAGE C for "bodily injury" or "property damage" included in <br /> medical expenses shall reduce the Desig- the "products-completed operations hazard" will <br /> nated Construction Project General Aggre- reduce the Products-Completed Operations Ag- <br /> gate Limit for that designated construction gregate Limit, and not reduce the General Ag- <br /> project. Such payments shall not reduce the gregate Limit nor the Designated Construction <br /> General Aggregate Limit shown in the Decla- Project General Aggregate Limit. <br /> rations nor shall they reduce any other Des- <br /> ignated Construction Project General Aggre- <br /> gate Limit for any other designated construc- <br /> tion project shown in the Schedule above. <br /> CG 25 03 03 97 Copyright, Insurance Services Office, Inc., 1996 Page 1 of 2 <br />