My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> WATERMAIN REPLACEMENT "T" <br /> WO NO. - UP3684 <br /> NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the WATERMAIN REPLACEMENT "T" will be received at the office <br /> of the City Clerk, 1st Floor Wall Street Building, 2930 Wetmore, Everett, Washington 98201, until 2:00 p.m. on <br /> Tuesday, November 13, 2018. At the appointed time, all bids will be opened and publicly read aloud in an <br /> assigned conference room on the 8th floor of the Wall Street Building. The engineer's estimate for this Project <br /> is $2,780,250. <br /> Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to <br /> construct approximately 1,100 linear feet of 12-inch ductile iron and 4,300 linear feet of 8-inch ductile iron <br /> ' watermain and other such appurtenances and performing all Work as required by the Contract, in accordance <br /> with the Contract Plans and Contract Provisions. <br /> Free-of-charge access to project bid documents (plans, specifications, addenda, and Bidders List) is provided to <br /> Prime Bidders, Subcontractors, and Vendors by going to www.bxwa.com and clicking on "Posted Projects", <br /> "Public Works", and "City of Everett". This online plan room provides Bidders with fully usable online <br /> documents with the ability to: download, view, print, order full/partial plan sets from numerous reprographic <br /> sources, and a free online digitizer/take-off tool. It is recommended that Bidders "Register" in order to receive <br /> automatic e-mail notification of future addenda and to place themselves on the "Self-Registered Bidders <br /> List". Bidders that do not register will not be automatically notified of addenda and will need to periodically <br /> check the on-line plan room for addenda issued on this project. Contact Builders Exchange of Washington at <br /> (425) 258-1303 should you require assistance with access or registration. <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a bid <br /> bond or certified check in an amount not less than five percent (5%) of the total amount of the Bid. <br /> ' The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No Bidder <br /> may withdraw his Bid after the hour set for the opening thereof. The City further reserves the right to make the <br /> bid award as deemed in the best interest of the City. The right is reserved by the City to postpone the award for <br /> a period of forty-five (45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to <br /> equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett, Washington. <br /> SHARON FULLER, CITY CLERK <br /> I <br /> I <br /> Watermain Replacement "T" ADVERTISEMENT FOR BIDS October 10, 2018 <br /> WO No—UP3684 SP - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.