1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> h. Contractor prepared piping schematics and diagram drawings representing <br /> the Equipment orientation. <br /> i. Final location of all surface and subsurface improvements. <br /> j. Record on the drawings the location of all field run materials. <br /> k. All shoring systems left in place at the end of construction. <br /> Contractor shall accurately show existing underground items including, but not limited <br /> to, piping, manholes, pull boxes, conduit, direct buried wire, foundations, equipment <br /> and obstructions found during construction on the record drawings. Note on the record <br /> drawings the actual size of all utilities and structures and types of material used. <br /> Locate all record drawing items by survey coordinates or dimensioned off NAD 83-91 <br /> for Horizontal Datum and NAVD 88 for Vertical Datum. Minimum requirements for <br /> accuracy are specified in the following chart. <br /> Description Horizontal Elevation Notes <br /> ' Location <br /> Gravity sewer and Coordinates, I.E. 0.01 ft. Recalculate actual slopes. <br /> drain lines stations, and All inverts in manholes. <br /> I � offsets 0.1 ft. All angle changes. <br /> Forcemains, Coordinates I.E. 0.1 ft. Record all angle points and <br /> watermains and and stations finished ground elev. Above <br /> ' transmission lines 1 0.1 ft. the invert elev. <br /> All other items, incl. 0.1 ft. 0.1 ft. Show dimensions on record <br /> Electrical and drawings. <br /> ' Structural <br /> Use red pen or pencil to make changes on the record drawings. Notations are to be <br /> neat, legible, clear and concise. <br /> ' Record information concurrently with the progress of construction. Conceal no work <br /> until the required information is verified and recorded. <br /> 1-08.11(3) Payment <br /> t No separate payment shall be made for the preparation of record drawings. All costs <br /> associated with the preparation of record drawings shall be included in the unit <br /> contract prices of other items in the Contract. <br /> 1-09 MEASUREMENT AND PAYMENT <br /> 1-09.1 Measurement of Quantities <br /> Supplement 1-09.1 by adding the following: <br /> Measurement by the Ton: Where items are specified to be paid for by the ton it will <br /> be the Contractor's responsibility to see that a certified weight ticket is given to the <br /> ' City's Inspector on the Project at the time of delivery of materials for each truckload <br /> delivered. Pay quantities will be prepared on the basis of certified weight tickets <br /> delivered to the City's Inspector at time of delivery of materials. Tickets not received <br /> by the City's Inspector on day of delivery will not be honored for payment. <br /> 1-09.3 Scope of Payment <br /> Supplement 1-09.3 by adding the following: <br /> ' 1-09.3(1) Schedule of Values <br /> The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br /> CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP-111 <br />