My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> tests, may nullify any such payment previously recommended to such extent as may <br /> be necessary in the City's Representative's opinion to protect the City from loss as a <br /> result of: ' <br /> 1. Defective or damaged Work. <br /> 2. A deductive Change Order. <br /> 3. Persistent failure of the Contractor to perform the Work in accordance with <br /> the Contract Documents, including failure to maintain the progress of the <br /> Work in accordance with the construction schedule. Persistent failure to <br /> maintain the progress of the Work shall mean that for a period of two <br /> consecutive months following a written notice from the City's Representative <br /> or City, the Contractor fails to correct a behind-schedule condition at a rate <br /> that would reasonably indicate that it will finish the Project on schedule. <br /> 4. Disregard of authority of the City or City's Representative or the laws of any <br /> public body having jurisdiction. <br /> 5. Liquidated damages. <br /> 6. Misrepresentation of the quality of materials or Equipment installed or amount <br /> of Work performed. <br /> 7. Discovery that a previous pay estimate erred with respect to the amount of <br /> Work performed or Equipment or materials installed, irrespective of the City's <br /> Representative's recommendation at the time of the progress pay estimate. <br /> The City may refuse to make payment of the full amount recommended by the City's <br /> Representative because of Contract Claims made against the City on account of <br /> Contractor's performance or furnishing the Work or because of liens filed in connection <br /> with the Work or other set offs entitling City to reduce the amount recommended. In <br /> such case, the City shall give Contractor prompt written notice with copy to the City's <br /> Representative stating the reasons for each action. <br /> 1-09.9(4) Final Payment Procedure <br /> Upon receipt of Contractor's written Notice that the Work is ready for final inspection <br /> and acceptance and upon receipt of a Final Contract Voucher Certification, the City's <br /> Representative will inspect the Work. If the City's Representative finds the Work <br /> acceptable under the Contract Documents and the Contract fully performed and if the <br /> Contractor has signed a Final Contract Voucher Certification, the City's Representative <br /> will issue a final Certificate for Payment. The Certificate for Payment will state that to <br /> the best of the City's Representative's knowledge, information and belief, the Work <br /> appears to have been completed in accordance with terms and conditions of the <br /> Contract Documents and that the entire balance found to be due the Contractor and <br /> noted in the final Certificate is due and payable. <br /> Final payment shall not become due until the Contractor submits to the City's <br /> Representative the following; I <br /> 1. an affidavit that payrolls, bills for materials and equipment, and other <br /> indebtedness connected with the Work for which the City or the City's <br /> property might be responsible or encumbered, less amounts withheld by City, <br /> have been paid or otherwise satisfied, <br /> 2. a certificate evidencing that insurance required by the Contract Documents to <br /> remain in force after final payment is currently in effect and will not be ' <br /> canceled or allowed to expire until at least 30 calendar days' prior written <br /> Notice has been given to the City.. <br /> I <br /> Watermain Replacement "T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No— UP3684 SP—116 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.