My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS , <br /> I <br /> Item ITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT I <br /> No. Qty <br /> Schedule B - Shoulder Stabilization <br /> 49 Mobilization LS 1 $ _ $ <br /> I <br /> 50 Surveying LS 1 $ _ $ <br /> 51 SPCC Plan LS 1 $ S I <br /> 52 Force Account FA 1 $4,000.00 $ 4,000.00 1 <br /> 53 Traffic Control Labor HR 160 $ _ $ I <br /> 54 Landscape Restoration LS 1 $ _ $ <br /> 55 Beam Guardrail Type 31, 8 Ft Long Post LF 150 $ $ <br /> 56 Beam Guardrail Non-Flared Terminal EA 2 $ _ $ <br /> SUBTOTAL SCHEDULE B $ I <br /> BID SUMMARY I <br /> Schedule A - Watermain $ I <br /> Schedule B - Shoulder Stabilization $ <br /> 111 <br /> TOTAL BID AMOUNT $ <br /> The bid items above are described further in Division B —Bid Items Descriptions. <br /> I <br /> I <br /> I <br /> Watermain Replacement "T" Division P- PROPOSAL October 10, 2018 <br /> WO No. -UP3684 SP-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.