My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1. A complete statement of the origin, composition, and manufacture of any or <br /> all materials to be used, <br /> 2. Samples of these materials for quality and fitness tests, <br /> 3. A progress schedule, in a form the City requires, showing the order of and <br /> time required for the various phases of the Work, <br /> 4. A breakdown of costs assigned to any bid item, <br /> 5. Attendance at a conference with the Engineer or representatives of the <br /> Engineer, <br /> 6. Obtain, and furnish a copy of, a business license to do business in the City of <br /> Everett. <br /> 7. A copy of State of Washington Contractor's Registration, or <br /> 8. Any other information or action taken that is deemed necessary to ensure that <br /> the Bidder is the lowest responsible bidder. <br /> 111 1-03 AWARD AND EXECUTION OF CONTRACT <br /> 1-03.1 Consideration of Bids <br /> Revise the first paragraph to read: <br /> After opening and reading Proposals, the City will check them for correctness of <br /> extensions of the prices per unit and the total price. If a discrepancy exists between <br /> the price per unit and the extended amount of any bid item, the price per unit will <br /> control. If a minimum bid amount has been established for any item and the Bidder's <br /> unit or lump sum price is less than the minimum specified amount, the City will <br /> unilaterally revise the unit or lump sum price, to the minimum specified amount and <br /> recalculate the extension. The total of extensions, corrected where necessary, <br /> including sales taxes where applicable and such additives and alternates as selected <br /> by the City, will be used by the City for Award purposes and to fix the awarded Contract <br /> Sum and the amount of the Contract Bond(s). <br /> Revise the third and fourth paragraphs of 1-03.1 to read as follows: <br /> Within 5 days after the opening of Proposals, a Bidder who wishes to claim error shall <br /> submit a notarized affidavit signed by the Bidder, accompanied by original work sheets <br /> used in the preparation of the Proposal, requesting relief from the responsibilities of <br /> I Award. <br /> The affidavit shall describe the specific error(s) and certify that the work sheets are the <br /> originals used in the preparation of the Proposal. The Engineer will review the certified <br /> work sheets to determine the validity of the claimed error and make recommendation <br /> to the City. If the City concurs in the claim of error, the Bidder will be relieved of <br /> responsibility, and the bid deposit of the Bidder will be returned. Thereafter, at the <br /> discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> responsive Bidder. <br /> 1-03.1(1) Identical Bid Totals <br /> Delete 1-03.1(1) in its entirety and substitute the following: <br /> 1-03.1(1) Preference for Resident Contractors <br /> (******) <br /> In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> applied to the Bid of that nonresident contractor. <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> ' WO No—UP3684 SP—53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.