Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I1-04.3 Reference Information <br /> Revise 1-04.3 to read as follows: <br /> IReference Information provided to the Contractor is not part of the Contract. The City <br /> of Everett does not guarantee the accuracy of the Reference Information and is not <br /> responsible for the content of the Reference Information in any manner. Any use of <br /> IReference Information by the Contractor is done solely at the Contractor's risk. <br /> 1-04.4 Changes <br /> I Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> 1-04.4(1) City's Right to Direct Changes to the Work <br /> I (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform <br /> I the Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be <br /> provided under this Contract, <br /> 1 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> I 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites. provided by the <br /> I City, and <br /> 7. Ordering the Contractor to accelerate or Delay the Work. <br /> If the Contractor and City do not agree upon scope of Work changed or adjustment to <br /> I the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br /> the Contractor to implement City directed change by notice. The City shall not pay or <br /> be responsible or liable for changes implemented by the Contractor without explicit <br /> I notice from the City to proceed. <br /> 1-04.4(2) Extra Work <br /> (******) <br /> I At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br /> (3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br /> the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br /> I the Contractor to perform the Extra Work on a Force Account basis. <br /> 1-04.4(3) Change Orders <br /> (******) <br /> I Changes to the Work may result in an increase or decrease in Contract Sum, as <br /> provided in 1-09.4 EQUITABLE ADJUSTMENT. Requests for an increase in Contract <br /> Time shall be made as provided in 1-08.3 PROGRESS SCHEDULE as applicable. <br /> I Substantial changes in Contract Time, Contract Sum or Work will often be negotiated <br /> and agreed between the Contractor and City before the City directs the Contractor to <br /> proceed with the change. <br /> I If the Contractor and City agree on the scope of Work and any changes to Contract <br /> Sum and Contract Time, the Contractor and City shall execute an agreed Change <br /> Order. However, if the Contractor and City do not agree, the City may, in its sole <br /> Idiscretion, issue a unilateral Change Order in the form attached to the Contract <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> 1 WONo—UP3684 SP-57 <br />