Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 7. Payments under the Contract including adjustment; <br /> 8. Suspension(s) of Work; <br /> 9. Termination of the Contract for default or public convenience; and <br /> 10. Approval of working or detail Plans and Submittals. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders <br /> from the City's Representative: <br /> 1. The City's Representative may use the City's resources, other contractors, or other <br /> means to accomplish the Work, and <br /> 111 <br /> 2. The City will not be obligated to pay the Contractor, and will deduct from the <br /> Contractor's payments, costs that result when other means are used to carry out <br /> the Contract requirements or City's Representative's orders. <br /> At the Contractor's risk, the City's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms, to carry out the City's Representative's <br /> orders, or to correct unsafe conditions of any nature; or I <br /> 2. It is in the public interest. <br /> The City's Representative and City shall have complete access to the Work and to the site <br /> of the Work and to the places where Work is being prepared or where materials, <br /> Equipment, and machinery are being obtained for the Work. If requested by the City's <br /> Representative or City. the Contractor shall provide the assistance necessary for obtaining <br /> such access, and shall provide information related to the inspection of construction. 111 <br /> Absence of such access or information, as needed, may result in the City's refusal to <br /> accept the Work. <br /> The City's Representative has the authority to recommend Change Orders, but does not <br /> have authority to approve Change Orders. Proposed Change Orders are subject to review <br /> and approval by the City. No proposed Change Order or any change of Contract Sum or <br /> Contract Time is effective or binding upon the City unless and until the Mayor or its <br /> designee signs it, as authorized by City Council or by ordinance. <br /> To detail and illustrate the Work, the City's Representative may furnish to the Contractor <br /> additional drawings and explanations consistent with the original Plans. The Contractor I <br /> shall perform the Work according to these additional drawings and explanations. <br /> The City's Representative may appoint assistants and inspectors to assist in determining <br /> that the Work and materials meet the Contract requirements. Assistants and inspectors I <br /> have the authority to reject defective material and suspend Work that is being done <br /> improperly, subject to the final decisions of the City's Representative or, when appropriate, <br /> the City. <br /> Y <br /> Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material <br /> furnished that does not meet the Contract requirements shall be at the Contractor's risk and <br /> shall not be a basis for a Contract Claim even if the inspectors or assistants purport to <br /> change the Contract. <br /> Assistants and inspectors may advise the Contractor of any faulty work or materials or <br /> infringements of the terms of the Contract; however, failure of the City's Representative or <br /> the assistants or inspectors to advise the Contractor does not constitute acceptance or <br /> approval. <br /> 1-05.3 Working Drawings <br /> Revise the second paragraph to read as follows: <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—62 I <br />