My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> omissions in the Working Drawings or from responsibility for having complied with the <br /> provisions of this section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. I <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require Working Drawings that may or may not be applicable to this specific project. <br /> This list is supplied as an aid to the Contractor and is by no means complete. <br /> Submittal requirements may be found in 1-05.3(1) or elsewhere in these Special <br /> Provisions. <br /> DIVISION 2 EARTHWORK I <br /> 2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-02 Culverts <br /> 7-02.2 Materials-Catalog Cuts or Standard Plans <br /> 7-03 Structural Plate Pipe, Pipe Arch, Arch and Underpass <br /> 7-03.2 Materials-Catalog Cuts or Standard Plans <br /> 7-04 Storm Sewers I <br /> 7-04.2 Materials-Catalog Cuts or Standard Plans <br /> 7-05 Manholes, Inlets, Catch Basins, and Drywells <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 7-09 Water Mains <br /> 7-09.2 Materials-Catalog Cuts or Standard Plans I <br /> 7-12 Valves For Water Mains <br /> 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 7-14 Hydrants <br /> 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 7-15 Service Connections <br /> 7-15.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISIO"d 8 MISCELLANEOUS CONSTRUCTION <br /> 8-11 Guardrail I <br /> 8-11.2 Materials-Catalog Cuts or Standard Plans <br /> 8-13 Monument Cases <br /> 8-13.2 Materials-Standard Plans <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by <br /> the Specifications, related Work performed prior to completion of the Engineer's review <br /> of the pertinent submission will be the sole expense and responsibility of the <br /> Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.