Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 Provide horizontal and vertical curve data. <br /> One copy of transit notes showing reference to horizontal and vertical control <br /> points. <br /> OTHER STRUCTURES <br /> Centerline or offset coordinates to centerline of the structure. <br /> A sufficient number of bench marks for levels to enable the Contractor to set <br /> grades at reasonably short distances. <br /> Monuments and control points as shown on the Plans. <br /> The Contractor shall give the City three weeks notification to allow adequate <br /> time to provide the above data. <br /> The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 1 <br /> 1. Slope stakes ±0.1 foot <br /> 2. Subgrade blue tops ±0.01 foot <br /> 3. Stationing ±0.01 foot <br /> 4. Alignment ±0.01 foot <br /> 5. Surfacing red & yellow tops ±0.01 foot <br /> 6. Superstructure elevations ±0.01 foot (from plan elevations) <br /> 7. Substructure ±0.02 foot (from plan elevations) <br /> The Contractor shall slope stake the roadway before any construction may proceed. <br /> Slope stakes shall be set at 50' maximum intervals on tangents and 25' on curves. <br /> Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in <br /> tangent sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br /> The Contractor's surveyor shall be a licensed surveyor in the State of Washington. I <br /> The Contractor shall keep updated survey field notes in a standard field book and in a <br /> format set by the Engineer. These field notes shall include all survey work performed <br /> by the Contractor's surveyor in establishing line, grade and slopes for the construction <br /> work. Copies of these field notes shall be provided to the Engineer upon request and <br /> upon completion of the Contract Work; the field book shall be submitted to the <br /> Engineer and become property of the City. <br /> If the survey work provided by the Contractor does not meet the standards of the <br /> Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br /> individual or individuals doing the survey work and the survey work will be completed <br /> by the Engineer at the Contractor's expense. Costs for completing the survey work <br /> required by the Engineer will be deducted from monies due or to become due the <br /> Contractor. <br /> The City may spot-check the Contractor's surveying. These spot-checks will not <br /> change the requirements for normal checking and testing as described elsewhere, and <br /> do not relieve the Contractor of the responsibility of producing a finished product that is <br /> in accordance with the Contract. <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br /> correct and the Contractor shall correct the discrepancies before construction work <br /> may proceed. No additional compensation will be paid for this corrective Work. <br /> Payment: The lump sum contract price for "Surveying" shall be full pay for all costs <br /> involved in furnishing all labor, tools, survey instruments, materials, and other <br /> equipment necessary for the setting and maintaining of the alignment and grade as <br /> specified. <br /> I <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—66 I <br />