Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor. All expenses in connection with such repairs will be charged to the <br /> Contractor. <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part <br /> of the Contractor to be performed or fulfilled under this Contract that has not, in fact, <br /> been performed or fulfilled at the time of such acceptance. All covenants and <br /> agreements shall continue to be binding on the Contractor until they have been <br /> fulfilled. <br /> The City and the Contractor agree that the guarantee on the completed portions of the <br /> Work possessed and used by the City shall commence as to those portions on the <br /> date that the City takes possession of those portions and so notifies the Contractor in <br /> writing. City and Contractor further agree that such taking possession and use shall <br /> not be deemed as acceptance of the Work. Takeover of completed portions of the <br /> Work shall be at the City's option and will not be made until the Work can be put into <br /> routine service on a permanent basis. <br /> The guarantee provided herein shall be in addition to those specific guarantee or <br /> warranty requirements for particular Equipment or Work items, or both, as indicated in <br /> the Specifications and Special Provisions. <br /> 1-05.11 Final Inspection <br /> Delete 1-05.11 and substitute the following: <br /> 1-05.11 Final Inspections and Operational Testing <br /> 1-05.11(1) Substantial Completion Date <br /> When the Contractor considers the Work to be substantially complete, the Contractor <br /> shall so notify the Engineer and request the Engineer establish the Substantial <br /> Completion Date. The Contractor's request shall list the specific items of Work that <br /> 1 remain to be completed in order to reach physical completion. The Engineer will <br /> schedule an inspection of the Work with the Contractor to determine the status of <br /> completion. The Engineer may also establish the Substantial Completion Date <br /> unilaterally. <br /> If, after this inspection, the Engineer concurs with the Contractor that the Work is <br /> substantially complete and ready for its intended use, the Engineer, by written notice to <br /> the Contractor, will set the Substantial Completion Date. if, after this inspection the <br /> Engineer does not consider the Work substantially complete and ready for its intended <br /> use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> therefore, <br /> Upon receipt of written notice concurring in or denying substantial completion, <br /> whichever is applicable, the Contractor shall pursue vigorously, diligently and without <br /> unauthorized interruption, the Work necessary to reach Substantial and Physical <br /> Completion. The Contractor shall provide the Engineer with a revised schedule <br /> indicating when the Contractor expects to reach substantial and physical completion of <br /> the Work. <br /> The above process shall be repeated until the Engineer establishes the Substantial <br /> Completion Date and the Contractor considers the Work physically complete and <br /> ready for final inspection. <br /> 1-05.11(2) Final Inspection and Physical Completion Date <br /> When the Contractor considers the Work physically complete and ready for final <br /> inspection, the Contractor, by written Notice, shall request the Engineer to schedule a <br /> final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> Watermain Replacement "T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> 1111 WO No—UP3684 SP—69 <br />