My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall be responsible for determining the exact location, including <br /> service connections, of all public and private underground utilities marked at the site of <br /> the Work. Perform field verification prior to beginning Work that could result in damage <br /> to buried utilities, including but not limited to exploratory excavations, in sufficient time <br /> so as not to impede the progress of the Work or fabrication of materials to be <br /> incorporated into the Work. The Contractor shall immediately notify the City's <br /> Representative as to any utility discovered by him in a different position than shown on <br /> the Plans or that is not shown on the Plans. <br /> No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of <br /> the City to show the existence of subsurface objects or installation on the Plans shall <br /> not relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its <br /> operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Snohomish County PUD #1 Puget Sound Energy <br /> P.O. Box 1107 P.O. Box 97034 BOT-01G 111Everett, Washington 98206 Bellevue, WA 98009-9734 <br /> Attn: Erin Burke Attn: Griffin Clark <br /> Tel. (425) 783-4745 Tel. (425) 495-0713 <br /> Email: EFBurke@SNOPUD.com Email: griffin.clark@pse.com I <br /> Frontier Communications NW CenturyLink Network <br /> Attn: Tim Rennick 1208 NE 64th Street, Rm 401 <br /> MC WA0104OS Seattle, WA 98115-6722 <br /> 1800 41st St Attn: Jack Johnson <br /> Everett, Washington 98201 Tel. (206) 345-0230 <br /> Tel. 425-263-4025. <br /> Email: tim.rennick@ftr.com <br /> I <br /> I <br /> I <br /> Watermain Replacement "T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—86 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.