My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> If the Work requires removing or relocating a utility, utility owners or their <br /> contractors will furnish all work necessary to adjust, relocate, replace, or construct <br /> their facilities. <br /> 1-07.17(2) Utility Construction, Removal or Relocation by Others <br /> Revise the first paragraph of 1-07.17(2) as follows: <br /> Any authorized agent of the City or utility owners may enter the City right-of-way <br /> or easement to repair, rearrange, alter, or connect their equipment. The Contractor <br /> shall cooperate with such effort and shall avoid creating delays or hindrances to <br /> those doing the Work. The Contractor shall arrange to coordinate work schedules <br /> as needed. <br /> 1-07.18 Public Liability and Property Damage Insurance <br /> Delete 1-07.18 and substitute the following: <br /> 1-07.18 Insurance <br /> (******) <br /> 1-07.18(1) General Requirements <br /> A. The Contractor shall obtain the insurance described in this section from insurers <br /> approved by the State Insurance Commissioner pursuant to RCW Title 48. The <br /> insurance shall be provided by an insurer with a rating of A-: VII or higher in the A.M. <br /> Best's Key Rating Guide, that is licensed to do business in the state of Washington, or <br /> issued as a surplus line by a Washington Surplus lines broker. The City reserves the <br /> right to approve or reject the insurance provided, based on the insurer (including <br /> financial condition), terms and coverage, the Certificate of Insurance, and <br /> endorsements. <br /> B. The Contractor shall keep this insurance in force during the term of the Contract <br /> and for 30 calendar days after the Physical Completion date, unless otherwise <br /> indicated in 1-07.18(1)C of this section. <br /> C. If any insurance policy is written on a claims made form, its retroactive date. and <br /> that of all subsequent renewals, shall be no later than the effective date of this <br /> Contract. The policy shall state that coverage is claims made, and state the retroactive <br /> date. Claims-made form coverage shall be maintained by the Contractor for a <br /> minimum of 36 months following the Final Completion or earlier termination of this <br /> Contract, and the Contractor shall annually provide the City with proof of renewal. If <br /> renewal of the claims made form of coverage becomes unavailable, or economically <br /> prohibitive, the Contractor shall purchase an extended reporting period, "tail", or <br /> execute another form of guarantee acceptable to the City to assure financial <br /> responsibility for liability for services performed. <br /> D. The insurance policies shall contain a "cross liability" provision. <br /> E. The Contractor's and all subcontractors' insurance coverage shall be primary and <br /> non-contributory insurance as respects the City's insurance, self-insurance, or111 <br /> insurance pool coverage. <br /> F. All insurance policies and Certificates of Insurance shall include a requirement <br /> providing for a minimum of 30 days prior written notice to the City of any cancellation in <br /> any insurance policy. <br /> G. Upon request, the Contractor shall forward to the City a full and certified copy of <br /> the insurance policy(s). The Contractor shall not begin Work under the Contract until <br /> the required insurance has been obtained and approved by the City. <br /> H. Failure on the part of the Contractor to maintain the insurance as required shall <br /> constitute a material breach of Contract, upon which the City may, after giving five <br /> Watermain Replacement "T" Division 1 -GENERAL REQUIREMENTS October 10, 2018 <br /> WO No-UP3684 SP-88 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.