My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 21 <br /> Evergreen Branch Library Expansion 2017-008 <br /> accepted as substantially complete. Except for any portion(s) of Work specified for early completion or <br /> required by the Owner for early possession, Substantial Completion will not occur for any Work until the <br /> entire Project is ready for possession and use. The acceptance notice will include a Punch List of <br /> incomplete Work items and corrective Work, set the date for their completion and repair,describe the <br /> division of responsibility between the Owner and Contractor,and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing, indicating acceptance of all <br /> of its terms and provisions. <br /> Subsequent to the Substantial Completion date,the Owner may exclude the Contractor from the Work <br /> during such periods when construction activities might interfere with the intended operation of the <br /> Project. The Owner,however, shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. <br /> 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project,including,but not limited to,record drawings, as-builts,required reports <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection,determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> Owner's Representative finds materials,Equipment,or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the fmal <br /> determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety,and the Contractor agrees to perform the Work as changed.Among <br /> others,these changes and alterations may include: <br /> ' 1. Deleting or omit any part of the Work,Equipment or material to be provided under this Contract, <br /> and <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications,designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment,materials, services,or sites,provided by the Owner,and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time, the Owner may, at its sole option,unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> Contractor without explicit notice from the Owner to proceed. <br /> ' 6.2 EXTRA WORK <br /> At its sole option,the Owner may(1)perform Extra Work itself, (2)employ others to do it, (3)direct the <br /> Contractor to perform the Extra Work at existing unit bid price,(4)direct the Contractor to perform the <br /> 1 <br /> 00 7200 -21 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.