My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 - 27 <br /> Evergreen Branch Library Expansion 2017-008 <br /> ' 8.6.5. Testing and Commissioning of Completed Work <br /> Testing and commissioning of all mechanical,electrical,and instrumentation systems and completed <br /> portions of the Work,functioning as a completed system and the complete Project, functioning as a <br /> completed facility,shall be done in accordance with the Specifications. <br /> 8.6.6. Storage of Materials and Equipment <br /> Contractor shall store materials and Equipment so as to insure the preservation of their quality and fitness <br /> for the Work. Stored Equipment and materials shall be located so as to facilitate inspection. The <br /> Contractor shall be responsible for damages,loss or casualty occurring to materials and Equipment until <br /> Final Acceptance. <br /> 8.6.7. Manufacturer's Directions <br /> Manufactured articles,material and Equipment shall be transported, stored,applied,installed,connected, <br /> erected,adjusted,tested,operated and maintained as recommended by the manufacturer,unless otherwise <br /> specified herein. Manufacturer's installation instructions and procedures shall be provided to the Owner <br /> prior to installation of the manufactured articles,material and Equipment. <br /> 8.7. DEFECTIVE WORK <br /> 8.7.1. Correction of Defective Work <br /> When,and as often as the Owner's Representative determines through his or her inspection procedures, <br /> material,Equipment or workmanship incorporated in the Project do not meet the requirements of the <br /> ' Contract,the Owner's Representative will give written notice of the noncompliance to the Contractor. <br /> Within fourteen(14)days from the receipt of such notice,the Contractor shall undertake the Work <br /> necessary to correct the deficiencies,and to comply with the Contract. If the Contractor disagrees with <br /> ' the Owner's Representative's determination and believes that the corrective Work should be covered by a <br /> Change Order,he or she shall immediately notify the Owner,in writing, setting forth its position. Within <br /> five(5)days after receipt of the Contractor's notification, the Owner will review the matter and notify the <br /> Contractor,in writing,of his or her determination. <br /> If the Owner determines that the corrective Work is required to comply with the Contract,the Contractor <br /> shall proceed with such Work. As a condition precedent to the Contractor's request for adjustment of <br /> Contract Sum,Contract Time,or both,resulting from the performance of such corrective Work, the <br /> ' Contractor shall,within fifteen(15)days after receipt of the Owner's determination,provide the Owner <br /> with Notice of a Contract Claim for an adjustment of Contract Sum, Contract Time, or both. Contract <br /> Claims not timely and completely submitted are deemed waived. The Contractor shall document the cost <br /> ' information associated with the corrective work with daily records in accordance with Force Account <br /> procedures and shall provide such information to the Owner's Representative daily. Receipt of the cost <br /> data by the Owner's Representative will not be construed to be an acceptance of the corrective Work,or <br /> ' an authorization for a Change Order to cover the corrective Work. Contractor waives any such Contract <br /> Claim by failing to maintain accurate and complete Force Account records. <br /> 8.7.2. Retention of Defective Work <br /> ' In its sole discretion,the Owner may retain Work that is not in compliance with the Contract. The Owner <br /> will determine the just and reasonable value for such defective Work and deductions will be made in the <br /> payments due or to become due to the Contractor. Final Acceptance will not act as a waiver of the <br /> Owner's right to recover from the Contractor an amount representing the deduction for retention of <br /> defective Work. <br /> 8.8. MATERIALS AND EQUIPMENT FURNISHED BY OWNER <br /> Contractor shall install materials and Equipment furnished by the Owner as provided in the technical <br /> sections of the Specifications. Furnishing of material and Equipment by the Owner will be considered <br /> 1 conclusive evidence of their acceptability for the purpose intended. If the Contractor discovers defects in <br /> material or Equipment furnished by the Owner, he or she shall immediately notify the Owner. After such <br /> 00 7200-27 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.