Laserfiche WebLink
I <br /> City of Everett 00 7200 - 29 <br /> Evergreen Branch Library Expansion 2017-008 <br /> Icorrection or repair or such removal and replacement(including but not limited to all costs of repair or <br /> replacement of Work of others)will be paid by Contractor. <br /> I <br /> The Owner is hereby authorized to make such repairs if,ten(10) days after giving of such notice to the <br /> Contractor,the Contractor has failed to make or undertake the repairs with due diligence. In case of an <br /> emergency where, in the opinion of the Owner,Delay could cause serious loss or damage,repairs may be <br /> I <br /> made prior to or concurrent with notice being sent to the Contractor. All expenses in connection with <br /> such repairs will be charged to the Contractor. <br /> In special circumstances where a particular item of equipment is placed in continuous service before <br /> ' Substantial Completion of all the Work,the correction period for that item may start to run from an earlier <br /> date if so provided in the Specifications. <br /> Where defective Work(and damage to other Work resulting there from)has been corrected or removed <br /> I <br /> and replaced under this Paragraph 8.7,the correction period hereunder with respect to such Work will be <br /> extended for an additional period of one year after such correction or removal and replacement has been <br /> satisfactorily completed. <br /> I <br /> Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation or warranty. The <br /> provisions of this Paragraph 8.10 shall not be construed as a substitute for or a waiver of the provisions of <br /> any applicable statute of limitation or repose. <br /> I9. MEASUREMENT AND PAYMENT .• <br /> 9.1. PAYMENTS TO CONTRACTOR <br /> 9.1.1. Schedule of Values <br /> I <br /> The Contractor shall submit a Schedule of Values at least fifteen(15)days prior to submitting its first <br /> Application for Payment. If the Project contains Unit Price Work,in whole or in part,then the Schedule <br /> of Values for that portion of the Work shall also be based on unit prices. If the Bid form calls for a lump <br /> sum price, in whole or in part,then the Schedule of Values shall: reasonably allocate the Contract Sum <br /> 1 <br /> among the various portions of the Work;be complete;be organized to include detailed breakdown of each <br /> major unit of the Work;be organized to correspond to Contractor's schedule;break down the Contract <br /> Sum showing the value assigned to each part of the Work; include an allowance for profit and Overhead; <br /> Iinclude Unit Price Work, if and to the extent indicated on the Bid form;be so organized as to facilitate <br /> assessment of work and payment of Subcontractors; and be balanced. To the greatest extent possible, the <br /> breakdown shall use the same tasks or units as the Contractor's schedule. Contractor shall provide <br /> I <br /> documentation substantiating the cost allocation if asked by the Owner's Representative. Upon <br /> acceptance of the Schedule of Values by the Owner's Representative,it shall be used as a basis for all <br /> requests for payment. <br /> I <br /> 9.1.2. Progress Payments <br /> 9.1.2.1 Payment Request Procedures: <br /> By the tenth day of each month, or by schedule mutually agreed upon in writing by the Contractor and <br /> I <br /> Owner's Representative,the Contractor shall submit to the Owner's Representative a partial payment <br /> estimate filled out and signed by the Contractor covering acceptable Work performed during the previous <br /> month, or since the last partial payment estimate was submitted. Contractor's submission of a progress <br /> I <br /> pay estimate constitutes a material representation by the Contractor that it performed all of the Work <br /> described in the progress pay estimate during the relevant time period in a workmanlike manner and that <br /> the materials for which payment is requested reasonably conform to the Specifications and are either on <br /> I the job Site or have been installed. If requested by the Owner's Representative,the Contractor shall <br /> provide such additional data as may be reasonably required to support the payment estimate. Such data <br /> may include satisfactory evidence of payment for Equipment,materials and labor including payments to <br /> Subcontractors and Suppliers. Certified invoices by the Suppliers shall accompany a request for payment <br /> I <br /> for delivered Equipment and material. Such Equipment and material shall be suitably and safely stored at <br /> 00 7200 - 29 GENERAL CONDITIONS <br />