My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 -45 <br /> Evergreen Branch Library Expansion 2017-008 <br /> IThe Owner and the Contractor shall not be responsible to compensate each other financially for <br /> any Delay solely caused by a third party for whom neither the Contractor nor the Owner is <br /> I <br /> responsible, or for any Delay caused solely by earthquake,flood, natural disasters,acts of war or <br /> acts of terrorism. A Delay caused by a utility's failure to provide service or relocate its lines <br /> (despite a timely request for such service or relocation)is an example of this kind of Delay for <br /> I which neither the Contractor nor the Owner is financially responsible to the other. Mislocated <br /> utility lines or utility lines not located are another example of a Delay for which neither the <br /> Contractor nor the Owner is responsible to the other. However, the Contractor's failure to request <br /> I <br /> a utility locate or relocation in a timely way is not,and any resulting Delay would be the <br /> responsibility of the Contractor. Because the Contractor is responsible for ordering materials and <br /> Equipment,Contractor shall not be entitled to an adjustment of Contract Time or Contract Sum <br /> due to Delays caused by the lack of materials or Equipment. A strike,job action,slowdown, <br /> ' work to rule, or other job action or labor dispute or problem is not a Delay caused by a third party <br /> for the purposes of section 12.4.3 Delays. <br /> 12.4.3.4.1.2 Adjustment of Contract Time <br /> IThe Contractor shall be entitled to an extension of Contract Time for Delays caused solely by a <br /> third party for whom neither the Contractor nor the Owner is responsible,or for any Delay caused <br /> solely by earthquake,flood,natural disasters,acts of war or acts of terrorism. Extension of <br /> IContract Time shall be determined pursuant to 5.2.2.2 Extensions of Contract Time. <br /> 12.4.3.4.2 Caused Concurrently by Third Parties and Contractor or Owner <br /> I <br /> If a Delay is caused concurrently by(a) a third party,earthquake,flood,natural disasters, acts of war <br /> or acts of terrorism and(b)either the Contractor or the Owner,then the Contractor or Owner is only <br /> responsible for the amount of Delay it caused in excess of the Delay caused by the a third party, <br /> earthquake, flood,natural disasters, acts of war or acts of terrorism. <br /> I12.4.3.4.2.1 Adjustment of Contract Sum <br /> The Contractor shall be entitled to an adjustment of Contract Sum for any Delay concurrently <br /> I caused by a third party and the Owner,but only to the extent Contractor clearly and convincingly <br /> demonstrates that the Owner caused the Delay to be longer than it would have been had it been <br /> caused solely by the third party. <br /> I 12.4.3.4.2.2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an adjustment of Contract Time for any Delay concurrently <br /> caused by a third party and the Owner,but only to the extent Contractor clearly and convincingly <br /> I demonstrates that the Owner caused the Delay to be longer than it would have been had it been <br /> caused solely by the third party. <br /> 12.4.3.5 Extended or Unabsorbed Overhead <br /> 12.4.3.5.1 General <br /> To present a request for additional compensation for Extended or Unabsorbed Overhead,the <br /> Contractor has the burden of keeping and maintaining accurate documentation to support any such <br /> I claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br /> Eichleay calculation, Contractor waives and releases any claim for Unabsorbed or Extended <br /> Overhead. In presenting any claim under this section of the Contract,the Contractor agrees to provide <br /> Ito the Owner any and all financial data needed by the Owner, or its representative, to review, <br /> substantiate and evaluate any claim for Extended and/or Unabsorbed Home Office Overhead. Failure <br /> to provide the requested information shall constitute waiver by the Contractor. <br /> I If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or Extended Overhead, it <br /> shall be calculated as provided in 9.5.3.Unabsorbed and Extended Overhead. 9.5.3 <br /> Unabsorbed and Extended Overhead <br /> I12.4.3.5.2 Elements <br /> 00 7200 -45 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.