Laserfiche WebLink
ICity of Everett 00 7200 -49 <br /> Evergreen Branch Library Expansion 2017-008 <br /> I15.3.4 Cross Liability Endorsement <br /> The policies of insurance shall contain a"cross liability"endorsement substantially as follows: <br /> IThe inclusion of more than one insured under this policy shall not affect the rights of any insured as <br /> respects any claim, suit,or judgment made or brought by or for any other insured or by or for any <br /> I employee of any other insured. This policy shall protect each insured in the same manner as though a <br /> separate policy had been issued to each,except that nothing herein shall operate to increase the <br /> company's liability beyond the amount or amounts for which the company would have been liable <br /> had only one insured been named. <br /> 1 15.3.5 Additional Insured <br /> The policies of insurance for general liability,automobile, and pollution policies shall be specifically <br /> Iendorsed to name the Owner,Owner's Representative, and each of their respective officers,elected <br /> officials,employees,agents,representatives, Subconsultants and volunteers,and other entities specifically <br /> required by the Contract Documents,as additional insured(s). Such endorsement shall not limit the policy <br /> I limits available to the Owner as additional insured to the coverage amounts required herein if the <br /> Contractor maintains larger policy limits. <br /> 15.3.6 Contractor Insurance Primary <br /> I Contractor's insurance shall be primary as respects the Owner, and any other insurance maintained by the <br /> Owner shall be excess and not contributing insurance with the Contractor's insurance. <br /> 15.3.7 Assumption of Risk <br /> IContractor hereby assumes all risk of damage to its property, or injury to its officers, directors, agents, <br /> contractors,or invitees,in or about the Property from any cause,and hereby waives all claims against the <br /> Owner. The Contractor further waives,with respect to the Owner only, its immunity under RCW Title <br /> I51,Industrial Insurance. <br /> 15.3.8 Cost Included in Price <br /> I All costs for insurance shall be incidental to and included in the unit contract prices or lump sum price of <br /> the Contract and no additional payment will be made for required insurance. <br /> 15.3.9 Subcontractors <br /> I Contractor shall furnish separate evidence of insurance as stated above for each Subcontractor or shall <br /> include all Subcontractors as insureds under its policies. All coverage for Subcontractors shall be subject <br /> to all the requirements stated herein and applicable to their profession. If Contractor does not include <br /> I Subcontractors as insured under Contractor's own insurance policies, Contractor shall be responsible for <br /> assuring that all Subcontractors obtain all insurance as required by this Agreement and that the Owner be <br /> specifically endorsed as an additional insured on such insurance. <br /> 1 15.3.10 No Work Until Insurance Requirements Met • <br /> Neither the Contractor nor any of its subcontractors shall begin work under the Contract until all required <br /> insurance has been obtained and approved by the Owner,irrespective of whether a Notice to Proceed has <br /> I been issued. Working or calendar days will be charged against Contract Time from the date specified in <br /> the Notice to Proceed(or the date of the Notice to Proceed, if no start date is specified in the Notice to <br /> Proceed),and will not be suspended or not charged if insurance requirements are not fulfilled. Purchase <br /> I of appropriate insurance and providing satisfactory evidence of required insurance is wholly the <br /> obligation of the Contractor, and any Delay that is not the fault of the Owner shall be attributed to the <br /> Contractor. <br /> I 15.3.11 Failure to Procure and Maintain Insurance <br /> Failure on the part of the Contractor to obtain, maintain and deliver the policy or policies(in whole or in <br /> part)and receipt or receipts as required shall constitute a material breach of Contract. After giving five <br /> I (5) working days notice to the Contractor to correct the breach,the Owner may, in its sole discretion and <br /> I00 7200 -49 GENERAL CONDITIONS <br />