Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2500 - 2 <br /> Evergreen Branch Library Expansion 2017-008 <br /> 1. LABELS: Locate required product labels and stamps on a concealed surface or, <br /> where required for observation after installation, on an accessible surface that is <br /> not conspicuous. I <br /> 1.4 SUBMITTALS <br /> A. PRODUCT LISTING SUBMITTAL: Submit three (3) copies of the product-listing <br /> schedule within thirty (30) days after the date of commencement of the work. Provide a <br /> written explanation for omissions of data, and for known variations from contract <br /> requirements. At Contractor's option, initial submittal of the product-listing schedule may <br /> be limited to product selections and product designations that must be established early <br /> in the contract time. Submit completed product-listing schedule within sixty (60) days <br /> after commencement of the work. <br /> 1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING I <br /> A. Deliver, store, and handle products in accordance with the manufacturer's <br /> recommendations, using means and method that will prevent damage, deterioration and <br /> loss, including theft. <br /> B. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding <br /> of construction spaces. <br /> C. Coordinate delivery with installation time to ensure minimum holding time for items that <br /> are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other <br /> losses. <br /> D. Deliver products to the site in the manufacturer's original sealed container or other I <br /> packaging system, complete with labels and instruction for handling, storing, unpacking, <br /> protecting and installing. <br /> E. Inspect products upon delivery to ensure compliance with the contract documents, and <br /> to ensure that products are undamaged and properly protected. <br /> F. Store products at the site in a manner that will facilitate inspection and measurement of ' <br /> quantity or counting of units. <br /> G. Store heavy materials away from the project structure in a manner that will not endanger , <br /> the supporting construction. <br /> H. Store products subject to damage by the elements above ground, under cover in a <br /> weather-tight enclosure, with ventilation adequate to prevent condensation. Maintain <br /> temperature and humidity within range required by manufacturer's instructions. <br /> I. OFF-SITE STORAGE: If requested by the Contractor and approved in writing by the I <br /> Owner, the Owner may make payment to the Contractor for products stored off-site. <br /> J. OWNER-FURNISHED MATERIALS: When materials or equipment furnished by the ' <br /> Owner for installation by the Contractor are to be delivered and stored prior to installation, <br /> 01 2500 - 2 SUBSTITUTION PROCEDURES <br />