Laserfiche WebLink
I <br /> City of Everett 00 2113 - 5 <br /> I Evergreen Branch Library Expansion 2017-008 <br /> Washington, then a comparable percentage disadvantage will be applied to <br /> the bid of that nonresident contractor. <br /> I b. RESPONSIVENESS: City will consider all the material submitted by the <br /> bidder to determine whether it is in compliance with the Contract Documents. <br /> The City reserves the right, at its discretion, to reject nonresponsive Bids. <br /> c. RESPONSIBILITY: <br /> 1) Mandatory Responsibility Criteria: RCW 39.04.350(1). It is the intent <br /> of City to award a contract to the lowest responsive and responsible <br /> Bidder. Before award, the Bidder must meet the Bidder responsibility <br /> I criteria under this Section 1.13.A.1.c.(1) to be considered a <br /> responsible Bidder. The Bidder may be required by the City to submit <br /> documentation demonstrating compliance with the criteria under this <br /> I Section 1.13.A.1.c.(1). The Bidder must: <br /> a) Registration. Have a current certificate of registration as a <br /> contractor in compliance with chapter 18.27 RCW, which must <br /> I have been in effect at the time of bid submittal; and <br /> b) UBI. Have a current Washington Unified Business Identifier <br /> (UBI) number; and <br /> I 2) State Requirements. If applicable: <br /> a) Have Industrial Insurance (workers' compensation) coverage for <br /> the bidder's employees working in Washington, as required in <br /> Title 51 RCW; <br /> I b) Have a Washington Employment Security Department number, <br /> as required in Title 50 RCW; <br /> c) Have a Washington Department of Revenue state excise tax <br /> I registration number, as required in Title 82 RCW; and <br /> 3) Disqualification. Not be disqualified from bidding on any public works <br /> contract under RCW 39.06.010 or 39.12.065(3). <br /> I 4) Apprentices. If the Project is subject to the apprenticeship utilization <br /> requirements in RCW 39.04.320, not have been found out of <br /> compliance by the Washington state apprenticeship and training <br /> I council for working apprentices out of ratio, without appropriate <br /> supervision, or outside their approved work processes as outlined in <br /> their standards of apprenticeship under chapter 49.04 RCW for the <br /> one-year period immediately preceding the date of the bid solicitation. <br /> I 5) Off-Site Pre-Fabricated Items. Not have violated RCW 39.04.370 <br /> more than one time as determined by the Department of Labor and <br /> Industries. <br /> I 6) Supplemental Bidder Responsibility Criteria: RCW 39.04.350(2). If <br /> this Project is subject to supplemental bidder responsibility criteria, <br /> then such criteria will be contained in SECTION 002213, <br /> I SUPPLEMENTAL INSTRUCTIONS TO BIDDERS. If there is no <br /> SECTION 002213, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br /> in the bid package, then the Project is not subject to supplemental <br /> bidder responsibility criteria. <br /> I d. BID PROTESTS: All protests by Bidders must be in accordance with Everett <br /> Municipal Code 3.46, "Bid Protest Procedures." <br /> I B. Pre-Award Conference <br /> 1. After Bid opening, but prior to award, the apparent successful Bidder shall, if <br /> requested by the City, attend a pre-award conference to respond to questions by <br /> 1 00 2113 - 5 INSTRUCTIONS TO BIDDERS <br /> I <br />