Laserfiche WebLink
City of Everett 01 3216 - 3 <br /> Evergreen Branch Library Expansion 2017-008 <br /> 1.6 WORK BY OTHERS <br /> A. Schedule must allow for timely incorporation of work under separate Contract with <br /> Owner. Work by others shall be as outlined in Section 01 1200 — Multiple Contract. <br /> Contractor shall incorporate required lead times and work schedule outlined in Section <br /> 01 1200 into the project schedule. <br /> 1.7 SCHEDULED WORK ITEMS <br /> A. The following activities in addition to detailed construction activities shall be included in <br /> the contractors' schedule. <br /> 1 1. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 3216 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 01 3216 - 3 CONSTRUCTION PROGRESS SCHEDULE <br /> I <br />