My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3223 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 01 3223 - SURVEY AND LAYOUT DATA <br /> I <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. The contract drawings provide baseline and benchmark references; the Contractor will <br /> be responsible for the layout of individual items of the Work. The responsibilities are as <br /> noted in 1.2, A and B of this specification section. <br /> I <br /> 1.2 SURVEYING: <br /> 1 A. The Contractor shall provide such field engineering services as are required for proper <br /> completion of the Work including, but not necessarily limited to: <br /> 1. Establishing and maintaining lines and levels from control points and baselines <br /> provided by the contract drawings. <br /> 2. Construction staking for all construction activities such as location of features, <br /> gridlines, structures including elevations of inverts, pipe slopes and rim elevations. <br /> ' 3. Recording of all as-built information. <br /> B. Survey base data: <br /> ' 1. The base date for the construction project area was compiled by the Architect. <br /> 2. The Owner makes no representation that the survey information is complete or <br /> that it addresses every site condition which may be significant to the Work. <br /> 1 <br /> 3. The provision of the survey information by the contract documents does not relieve the Contractor of the responsibility to carefully examine the site and to take into <br /> account any conditions or variance with or in addition to the conditions shown on <br /> the survey. <br /> 4. The existence and location of underground and other utilities and facilities <br /> indicated as existing are not guaranteed. Before beginning site work, investigate <br /> and verify the existence and location of underground utilities and other <br /> construction. <br /> 5. Upon award of contract and at the request of the contractor, an electronic copy of <br /> base and design data will be made available. <br /> ' C. Proposed Site Layout: <br /> 1. The Proposed Site Layout was designed and compiled by Architect. The owner <br /> makes no representation that the information is complete or that it addresses every <br /> site condition which may be significant to the work. <br /> 1.3 RELATED WORK SPECIFIED ELSEWHERE: <br /> A. All sections included in these specifications. <br /> 1.4 QUALITY ASSURANCE: <br /> 1 01 3223 - 1 SURVEY AND LAYOUT DATA <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.