My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 3553 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 01 3553 - SECURITY PROCEDURES <br /> I <br /> PART 1 - GENERAL <br /> 111 <br /> 1.1 SUMMARY <br /> I A. Section Includes: Procedures to maintain security including unauthorized entry, <br /> vandalism, and theft to buildings and grounds at Project site. <br /> IB. Related Sections: <br /> 1. Section 01 3119 - Project Meetings <br /> 1 2. Section 01 5000—Temporary Facilities and Controls <br /> 1.2 SECURITY PROGRAM <br /> IA. Arrange with Owner, at Preconstruction Meeting specified Section 01 3119, to set up <br /> security program to prevent unauthorized entry and to protect against other security <br /> I <br /> problems, including loss due to theft, vandalism, and fire. <br /> B. Arrange with Owner for access keys as necessary to perform Work of this Contract. <br /> 1 1. Keys Issued by Owner: Do not duplicate. Return to Owner at Final Completion. <br /> 2. Keys not returned: Re-key locks at Contractor's expense and provide new keys <br /> conforming to keying types required by Owner. <br /> IC. Establish adequate flood lighting to allow monitoring of Project site during evening <br /> hours. <br /> 1 <br /> 1.3 STORAGE AND PROTECTION <br /> I A. Provide for secure lockup of stored materials and take additional measures to protect <br /> against theft vandalism, and other loss of property belonging to Owner located on site <br /> and at off-site facilities. <br /> I <br /> 1.4 ENTRY CONTROL <br /> IA. Restrict entrance of unauthorized persons and vehicles into construction areas. <br /> B. Maintain log with names and dates of those who enter site. <br /> IC. Maintain security of construction fencing and gates as approved by Owner in advance. <br /> Lock at end of each working day. <br /> ID. Maintain security site lighting systems as approved by Owner in advance. <br /> 01 3553 - 1 SECURITY PROCEDURES <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.