My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 4200 - 4 <br /> Evergreen Branch Library Expansion 2017-008 <br /> CONC. CONCRETE <br /> COND. CONDITION <br /> CONN. CONNECTIONII <br /> CONT. CONTINUOUS <br /> C.P. CONCRETE PIPE <br /> C.P.P. CORRUGATED-PERFORATED PIPE I CTRS. CENTERS <br /> C.W. CONCRETE WALK <br /> C.Y. CUBIC YARD <br /> D.F. DOUGLAS FIR <br /> DET. DETAIL <br /> DIA. DIAMETER <br /> DIM. DIMENSIONI <br /> D.L. DAYLIGHT GRADE <br /> E. EAST <br /> EA. EACH <br /> E.J. EXPANSION JOINT <br /> ELEC. ELECTRICAL <br /> EL.or ELEV. ELEVATION <br /> ENG. ENGINEER <br /> E.P. EDGE OF PAVING <br /> E/Q. EQUAL <br /> E.W. EACH WAYII <br /> EX. EXISTING <br /> EXIST. EXISTING <br /> F.E. FINISHED ELEVATION <br /> I <br /> F.G. FINISH GRADE <br /> F.H. FIRE HYDRANT <br /> FIN. FINISH <br /> F.L. FLOW LINE <br /> FLD. FIELD <br /> F.S. FINISH SURFACE I FTG. FOOTING <br /> GA. GAUGE <br /> GAL. GALLON <br /> I <br /> GALV. GALVANIZED <br /> G.C. GROUND COVER <br /> G.E. GRATE ELEVATION <br /> G.I. GALVANIZED IRON <br /> H.B. HOSE BIBB <br /> HDPE HIGH DENSITY POLYETHYLENE <br /> HDR. HEADERBOARD or HEADER I H.H. HAND HOLE <br /> HT. HEIGHT <br /> I.D. INSIDE DIAMETER <br /> I.E INVERT ELEVATION <br /> INV. INVERT <br /> J.B. JUNCTION BOX <br /> JTS JOINTS <br /> L.A. LANDSCAPE ARCHITECT <br /> L.C. LENGTH OF CURVE <br /> 01 4200 - 4 REFERENCES I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.