My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 4500 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 01 4500 - QUALITY CONTROL <br /> 1 <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for quality assurance <br /> and quality control. <br /> B. Testing and inspecting services are required to verify compliance with requirements <br /> specified or indicated. These services do not relieve Contractor of responsibility for <br /> compliance with the Contract Document requirements. <br /> 1. Specified tests, inspections, and related actions do not limit Contractor's quality- <br /> control procedures that facilitate compliance with the Contract Document <br /> requirements. <br /> 2. Requirements for Contractor to provide quality-control services required by <br /> Engineer, City, or authorities having jurisdiction are not limited by provisions of this <br /> Section. <br /> C. Contractor will pay for all proctor tests for all materials used for fill. <br /> D. Owner will employ and pay for the services of an independent testing laboratory to <br /> perform specified laboratory testing of materials: <br /> 1. In-place soil, gravels and import fill density testing. <br /> 2. In-place asphalt density testing. <br /> 3. Concrete slump, air content, and compression testing, excluding initial mix <br /> ' designs. <br /> 4. In place masonry grout. <br /> 5. Anchor bolts and structural anchors. <br /> 1.2 DEFINITIONS <br /> A. Quality-Assurance Services: Activities, actions, and procedures performed before and <br /> during execution of the Work to guard against defects and deficiencies and ensure that <br /> proposed construction complies with requirements. <br /> B. Quality-Control Services: Tests, inspections, procedures, and related actions during and <br /> after execution of the Work to evaluate that completed construction complies with <br /> requirements. Services do not include contract enforcement activities performed by <br /> Engineer. <br /> C. Testing Agency: An entity engaged to perform specific tests, inspections, or both. <br /> Testing laboratory shall mean the same as testing agency. <br /> 111 <br /> 1.3 DELEGATED DESIGN <br /> 1 01 4500 - 1 QUALITY CONTROL <br />
The URL can be used to link to this page
Your browser does not support the video tag.