My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 5500 - 6 <br /> Evergreen Branch Library Expansion 2017-008 <br /> 2) Maintain 2 way traffic at all times except on "one-way" Streets. <br /> Additional width for facilitating traffic flow may be obtained by <br /> requesting on Street parking to be prohibited adjacent to the work area <br /> 3) Maintain traffic on a paved surface whenever possible. In the event <br /> that a graveled or dirt surface must be used as a detour, maintain a <br /> smooth surface and control dust <br /> 4) Clean up spillage from trucks on the pedestrian or driving surface <br /> adjacent to the work area. <br /> 5) Provide safe and protected pedestrian ways. <br /> 6) Do not park or place construction Equipment to create an unnecessary <br /> sight distance or other safety obstruction to vehicular or pedestrian <br /> traffic. <br /> 7) Maintain work area traffic control devices in a proper condition on an <br /> "around the clock" basis whether or not work is actively being pursued. <br /> In addition, the Contractor shall assure that tools and Equipment are <br /> properly stored and excavation bridging is secure and adequately <br /> covering excavation. <br /> d. Erect and maintain all construction signs, warning signs, detour signs, and <br /> other traffic control devices necessary to warn and protect the public at all <br /> times from injury or damage resulting from the Contractor's operations. <br /> e. Be liable for injuries and damages to persons and property suffered by <br /> reason of the Contractor's operations or any negligence in connection <br /> therewith. <br /> f. Construct, maintain in a safe condition, keep open to traffic, and remove <br /> when no longer needed detours and temporary approaches that will <br /> accommodate traffic diverted from the Roadway, walkway or bridge during <br /> construction. On site or off site detours required or necessitated by the <br /> Work, including side Street crossings, temporary bridges, utilization of one <br /> or more lanes of the construction area for maintenance of through traffic, and <br /> related traffic control shall be the responsibility of the Contractor. <br /> B. Traffic Control Management <br /> 1. General: <br /> a. All Projects in Street areas will be inspected with regard to type and <br /> placement of pedestrian and vehicular traffic control devices. Traffic control <br /> devices not meeting the requirements of the MUTCD Manual shall be <br /> considered non standard. Non standard traffic control devices shall not be <br /> used unless specifically approved for use, in writing, by the Owner. <br /> b. The Contractor shall patrol the traffic control area as often as necessary, but <br /> at least daily, and reset all disturbed signs and traffic control devices. Signs <br /> and other traffic control devices shall be removed or covered during periods <br /> when they are not necessary. <br /> c. Before beginning Work, the Contractor shall designate an individual or <br /> individuals to perform the duties of Traffic Control Manager (TCM). These <br /> individuals shall be in continuous responsible charge of traffic control. A <br /> TCM is required on all Projects that require traffic control. <br /> 2. Traffic Control Manager (TCM) - The duties of the TCM shall include: <br /> a. Discussing proposed traffic control measures and coordinating <br /> implementation of the Contractor adopted traffic control plan(s) with the <br /> Owner <br /> 01 5500 - 6 VEHICULAR ACCESS AND PARKING <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.