My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2513 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 00 2513 - PRE-BID MEETING <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> IA. Section includes location and agenda of the pre-bid meeting. <br /> 1.2 DATE <br /> A. Meeting 1 - September 27, 2018 <br /> B. Meeting 2 - September 28, 2018 <br /> 1.3 LOCATION <br /> A. The meeting place will be at the site 9512 Evergreen Way, Everett WA. <br /> 1.4 TIME <br /> A. Meeting/site visit will start promptly at 10:00 a.m. <br /> 1.5 AGENDA <br /> A. Review Scope of Project <br /> B. Review required documents to be submitted with the Bid Form <br /> C. Bid Due Date <br /> D. Review Scope of Work <br /> E. Review Addendums to date <br /> F. Review bid documents, instructions to bidders etc. <br /> G. Review Bid Sheet <br /> H. Receive questions, comments from bidders <br /> ' I. Contractors free to wander construction site <br /> 1.6 ADDENDA <br /> 00 2513 - 1 PRE-BID MEETING <br />
The URL can be used to link to this page
Your browser does not support the video tag.