My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 4336 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 00 4336 -PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation,air conditioning, plumbing (as defined by RCW Chap. 18.106) and <br /> ' electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the Work, <br /> Bidder shall write "NO WORK". <br /> ' 2. Bidder shall not list more than one Subcontractor for each category of Work identified, <br /> unless Subcontractors vary with Bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating,ventilation, air conditioning, plumbing and electrical work, Bidder fails: <br /> (1) to submit as part of the Bid the names of such Subcontractors; (2) to name <br /> itself to perform such Work; or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors applies only to proposed heating, ventilation and <br /> air conditioning, plumbing, and electrical subcontractors who will contract directly with the <br /> general contractor submitting the Bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor or Bidder <br /> HEATING Inc. <br /> Subcontractor, bidder or "no work" MUST be aOlOq i*v" A-v-e NE • Wwoa'iviv'►Iki w� <br /> stated <br /> VENTILATION AND AIR CONDITIONING �Jc hem Seh NltGka. .1 col <br /> Subcontractor, bidder or "no work" MUST be (36101N440Ave NE y�load n v )Ir, 1.414 <br /> stated <br /> PLUMBING (as described in RCW Chap. 18.106) 14,1 Pt,Anivin <br /> Subcontractor, bidder or "no work" MUST be 90 o Ro►� at tt t <br /> stated GYah i+t 14 1(5, (,‘fk <br /> ELECTRICAL (as described in RCW Chap. 19.28) Sys yrs mal u fi68T <br /> Subcontractor, bidder or"no work" MUST be stated pib>c Saimam• <br /> ' END OF SECTION 00 4336 <br /> I <br /> I <br /> 00 4336 - 1 PROPOSED SUBCONTRACTORS FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.