My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 0001 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 00 0001 - CONTACT LIST <br /> IParticipants <br /> Owner City of Everett— Facilities Dept. Phone:425/257-8896 Facilities <br /> I 3101 Cedar Street Phone:425/257-8022 Director <br /> Everett, WA 98201 <br /> Ruben Sanchez, Facilities Management rsanchez@everettwa.gov <br /> IAbigail Cooley, Everett Library Director acooley(a.everettwa.gov <br /> Architect Dykeman Phone:425/259-3161 <br /> 1716 West Marine View Drive Fax: 425/259-5242 <br /> I Everett, WA 98201 <br /> Kelli Smith, Principal kellis@dykeman.net <br /> Tom Hudson, Project Manager thomash@dykeman.net <br /> IDerek Franz, Job Captain derekf@dykeman.net <br /> Civil KPFF Phone:206/622-5822 <br /> I Engineer 1601 Fifth Avenue, Suite 1600 Direct: 206/926-0519 <br /> Seattle, WA 98101 <br /> Alberto G. Cisneros alberto.cisneros@kpff.com <br /> Chris Borzio chris.borzio@kpff.com <br /> I <br /> LandscapeWeisman Design Group Phone:206/322-1732 <br /> Consultant 2329 E. Madison St. Fax: 206/292-8824 <br /> I Seattle, WA 98112 <br /> Nick Hagan, Principal nick@wdginc.com <br /> Andrea Leuschke andrea@wdginc.com <br /> Structural KPFF Phone:206/622-5822 <br /> Consultant 1601 Fifth Avenue, Suite 1600 Direct: 206/926-0494 <br /> I Seattle, WA 98101 <br /> Andy Ewing, Principal andy.ewinq@kpff.com <br /> Adam Radke adam.radke(a.kpff.com <br /> I Mechanical Harris Group Phone:206/494-9508 <br /> Engineer 20201 Cedar Valley Road, Suite 120 Mobile:425/238-9031 <br /> Lynnwood, WA 98036 <br /> I Randy Hinton, Manager <br /> randy.hinton@harrisqroup.com <br /> Kevin Yamada, Project Engineer kevin.yamadac harrisgroup.com <br /> I Electrical/AWA Electrical Consultants, Inc. Phone:425/775-1799 <br /> Telecom 19015 36th Ave., Suite, E <br /> Engineer Lynnwood, WA 98036 <br /> Brad Adcock, Principal brad(a.awaelec.om <br /> 1 Duane Keu, Project Engineer duane@awaelec.com <br /> Geotech HWA GeoSciences Inc. Phone:425/774-0106 <br /> I 21312 30th Drive SE, Suite 110 Mobile: 206/794-3123 <br /> Bothell, WA 98021 <br /> Steven E. Greene, Vice President sgreene@hwageo.com <br /> 111 00 0001 - 1 CONTACT LIST <br /> 11 <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.