My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - 7 <br /> Evergreen Branch Library Expansion 2017-008 <br /> 1 2.3.3. Utilities <br /> 2.3.3.1 General <br /> IThe Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br /> of the owners of known utilities in the vicinity of the Work.The positions of these utilities as derived <br /> from such records are shown on the Drawings. No excavations were made to verify the locations shown <br /> I for underground utilities. The service connections to these utilities are not shown on the Drawings. It <br /> shall be the responsibility of the Contractor to determine the exact location of utilities and service <br /> connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br /> I progress of the Work or fabrication of materials to be incorporated into the Work. The Contractor shall <br /> call the Utility Location Request Center(one call center) for location of utilities in the field not less than <br /> two(2)nor more than(10)ten business days before the scheduled date of commencement of excavation. <br /> I The Contractor shall make its own investigations,including exploratory excavations, to determine the <br /> locations and type of existing utilities,including service connections,prior to commencing work that <br /> could result in damage to such utilities. The Contractor shall immediately notify the Owner's <br /> I Representative as to any utility discovered by him in a different position than shown on the Drawings or <br /> which is not shown on the Drawings. No excavation shall begin until all known facilities in the <br /> excavation areas have been marked. Contractor shall coordinate its activities with the utility provider. <br /> Contractor shall bear the cost of maintaining utility service. <br /> IThe Contractor should be aware of,and comply with,Chapter 19.122 RCW,a law relating to <br /> underground utilities. The Owner shall not pay Contractor any of Contractor's cost of complying with <br /> this law,and repairing or indemnifying any damage or injury arising out of Contractor's failure to comply <br /> Iwith this law. <br /> Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> 1 maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> the utility. <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets, alleys,rights-of- <br /> ' way, or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> 2.3.3.2 Known Utilities <br /> I The Contractor shall provide at its sole expense all labor, equipment,materials and services necessary to <br /> remove,relocate,or maintain utilities specified on the Drawings. The work on each utility shall be <br /> performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br /> ' work with its own forces at the Contractor's expense,or permitting the work to be performed by the <br /> Contractor. <br /> 2.3.3.3 Service Connections <br /> ' Locations of service connections are not identified on the Drawings. The Contractor shall provide at its <br /> sole expense all labor, equipment and material to remove,relocate or maintain service connections. Work <br /> on service connections shall be performed in a manner satisfactory to the service connection owner. The <br /> I <br /> service connection owner has the option of doing such work with its own force at the Contractor's <br /> expense, or permitting the work to be performed by the Contractor. <br /> 2.3.3.4 Unknown Utilities <br /> I When a utility interferes with the Work and is either(1)not identified on the Drawings or(2)located in a <br /> position significantly different from that specified on the Drawings,Contractor shall follow the <br /> procedures of 11.DIFFERING SITE CONDITIONS. Interference with the Work is defined as a utility <br /> I that crosses or projects into the plane of the Work at an elevation between the top and bottom of the <br /> Work. If it is necessary to remove, relocate, or temporarily maintain the utility,that work shall be <br /> included in a Change Order. The utility owner has the option of doing such work or permitting the work <br /> I to be performed by the Contractor. In either case,the cost of the work incurred by or charged to the <br /> Contractor will be included in a Change Order. <br /> I <br /> 00 7200 -7 • GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.