My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - 9 <br /> Evergreen Branch Library Expansion 2017-008 <br /> IThe Owner's Representative's decisions will be final on all questions including but not limited to,unless <br /> specifically assigned to an Architect or Engineer,the following: <br /> I1. Measurement of Work,whether lump sum,Force Account,or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> I 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> 5. Fulfillment of the Contract by the Contractor; <br /> IG. Payments under the Contract including adjustment and; <br /> 7. Suspension(s)of Work. <br /> I If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner's <br /> Representative: <br /> I 1. The Owner's Representative may use the Owner's resources,other contractors,or other means to <br /> accomplish the Work, and <br /> 2. The Owner will not be obligated to pay the Contractor,and will deduct from the Contractor's <br /> I payments, any costs that result when any other means are used to carry out the Contract <br /> requirements or Owner's Representative's orders. <br /> At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> I 1. The Contractor fails to fulfill Contract terms,to carry out the Owner's Representative's orders,or <br /> to correct unsafe conditions of any nature; or <br /> 2. It is in the public interest. <br /> IThe Owner's Representative and Owner shall have complete access to the Work and to the Site of the <br /> Work and to the places where Work is being prepared or where materials, Equipment, and machinery are <br /> being obtained for the Work. If requested by the Owner's Representative or Owner,the Contractor shall <br /> I <br /> provide the assistance necessary for obtaining such access,and shall provide information related to the <br /> inspection of construction. Absence of such access or information,as needed,may result in the Owner's <br /> refusal to accept the Work. <br /> I The Owner's Representative has the authority to recommend Change Orders,but does not have authority <br /> to approve Change Orders. Proposed Change Orders are subject to review and approval by the Owner. <br /> No proposed Change Order or any change of Contract Sum or Contract Time is effective or binding upon <br /> I the Owner unless and until the Mayor or his or her designee signs it,as authorized by City Council or by <br /> ordinance. <br /> To detail and illustrate the Work, the Owner's Representative may furnish to the Contractor additional <br /> 1 Drawings and explanations consistent with the original Drawings. The Contractor shall perform the Work <br /> according to these additional Drawings and explanations. <br /> The Owner's Representative may appoint assistants and inspectors to assist in determining that the Work <br /> I and materials meet the Contract requirements. Assistants and inspectors have the authority to reject <br /> defective material and suspend Work that is being done improperly,subject to the final decisions of the <br /> Owner's Representative or,when appropriate,the Owner. <br /> IAssistants and inspectors are not authorized to accept work,to accept materials, to issue instructions,or to <br /> give advice that is contrary to the Contract. Work done or material furnished which does not meet the <br /> Contract requirements shall be at the Contractor's risk and shall not be a basis for a Contract Claim even <br /> Iif the Owner's Representative,inspectors or assistants purport to change the Contract. <br /> Assistants and inspectors may advise the Contractor of faulty Work or materials or infringements of the <br /> terms of the Contract;however, failure of the Owner's Representative or the assistants or inspectors to <br /> Iadvise the Contractor does not constitute acceptance or approval. <br /> I00 7200 - 9 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.