My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 11 <br /> Evergreen Branch Library Expansion 2017-008 <br /> one-third of the Work by dollar volume and Contractor shall not sublet to a single Subcontractor more <br /> than one-half of the Project. A Subcontractor of the Contractor shall not sublet to another Subcontractor <br /> more than one-half of its work without the written consent of the Owner obtained within twenty(20)days <br /> of award of the Contract to the Contractor. The Owner may refuse to approve such subcontract for any <br /> reason. Only unit price and Schedule of Value items of the Contract will be used in computing the total <br /> 1 Work. The Owner may,at its sole option,refuse to approve a Subcontractor that is also providing <br /> services to the Owner on the same project. <br /> Subcontractors will be considered agents of the Contractor and their work shall be subject to the <br /> provisions of the Contract. References in the Contract Documents to actions required of Subcontractors, <br /> manufacturers, Suppliers,or persons other than the Contractor,the Owner or the Owner's Representative <br /> shall be interpreted as requiring that the Contractor shall require such Subcontractor,manufacturer, <br /> Supplier or Person to perform the specified action. <br /> Contractor shall comply with RCW 39.04.250(1992)and RCW 39.76.011 (1992), as amended,and any <br /> successor and other laws, ordinances,and regulations regarding payment of Subcontractors. Contractor <br /> ' shall also comply with the requirements of RCW Chap. 60.28 and any other law, ordinance, or regulation <br /> relating to the release of retainage to Subcontractors. <br /> The Contractor shall specifically include in each of its first tier subcontracts the language in this section <br /> with regard to the Subcontractor's obligation to meet bidder responsibility criteria,and shall require each <br /> of its Subcontractors to include substantially the same language of this section in each of their <br /> subcontracts,adjusting only as necessary the terms used for the contracting parties. The requirements of <br /> this section apply to all Subcontractors regardless of tier. <br /> At the time of subcontract execution,the Contractor must verify that each of its first tier subcontracts <br /> meets the following bidder responsibility criteria: <br /> 1. At the time of subcontract Bid Submittal,have a certificate of registration in compliance with <br /> Chapter 18.27 RCW; <br /> 2. Have a current state unified business identifier number; <br /> ' 3. If applicable,have: <br /> a. Industrial insurance coverage for the Subcontractor's employees working in Washington as <br /> required in Title 51 RCW; <br /> b. An employment security department number as required in Title 50 RCW' <br /> c. A state excise tax registration number as required in Title 82 RCW; <br /> 1 d. An electrical contractor license,if required by Chapter 19.28 RCW; <br /> e. An elevator contractor license,if required by Chapter 70.87 RCW. <br /> 4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br /> 39.12.065(3). <br /> 5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br /> RCW 39.04.320,not have been found out of compliance by the Washington state apprenticeship <br /> and training council for working apprentices out of ratio,without appropriate supervision,or <br /> outside their approved work processes as outlined in their standards of apprenticeship under <br /> chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br /> solicitation;and <br /> 6. Until December 31,2013,not have violated RCW 39.04.370 more than one time as deteimined <br /> by the department of labor and industries. <br /> I <br /> 00 7200 - 11 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.