ICity of Everett 00 7200 - 17 <br /> Evergreen Branch Library Expansion 2017-008 <br /> Iaccordance with these General Conditions. Extensions of Contract Time will be granted only as provided <br /> in the General Conditions and to the extent that affected critical activities exceed the Total Float time <br /> I <br /> along the affected paths of the reviewed Preliminary Schedule at the time the change was authorized in <br /> writing by the Owner. Contractor has the burden of clearly and convincingly demonstrating entitlement <br /> to any adjustment of Contract Time. <br /> I If the Owner is solely responsible for any Delay to Substantial Completion,Physical Completion, <br /> Completion Date,or Final Acceptance, the Contractor shall only be entitled to compensation or other <br /> damages as described in 12.4 REMEDIES,provided that Contractor timely gave Notice pursuant to 10. <br /> I NOTICE TO OWNER,timely submitted a Contract Claim pursuant to 12. CONTRACT CLAIMS and <br /> fulfilled the requirements of 5.2.2.Construction Schedule. <br /> 5.2.3. Construction Progress <br /> I <br /> The Contractor shall furnish all labor,materials, facilities and Equipment necessary to insure the <br /> prosecution and completion of the Project within the interim milestones, Substantial Completion,Physical <br /> Completion and Completion Dates of the Contract. If Work falls seven(7)days or more behind the <br /> I reviewed Preliminary Schedule,the Contractor agrees that, at its sole cost and expense, it will take all <br /> actions necessary to return the Project to the accepted schedule. These actions may include the following: <br /> 1. Increase labor in quantities and crafts. <br /> 1 2. Increase the number of working hours per shift, shifts per working day,working days per week, <br /> or the amount of Equipment, or any combination of the foregoing. <br /> I <br /> 3. Reschedule activities. <br /> If requested by the Owner's Representative, the Contractor shall prepare a proposed schedule revision <br /> demonstrating a plan to make up the lag in progress and insure completion of the Work within the <br /> I <br /> Contract Time. All actions taken to return the Project to the accepted schedule are at the Contractor's <br /> expense. <br /> The Contractor shall pay all costs incurred by the Owner that result from the Contractor's action to return <br /> ' the Project to its accepted schedule,including, but not limited to,additional,overtime,or third party <br /> inspection,design and construction management service costs. Contractor agrees that Owner shall deduct <br /> such charges from payments due the Contractor. It is further understood and agreed that none of the <br /> I <br /> services performed by the Owner's Representative in monitoring, reviewing and reporting Project status <br /> and progress shall relieve the Contractor of responsibility for planning and managing construction Work <br /> in conformance with the construction schedule. <br /> I 5.2.4. Delays <br /> 5.2.4.1 General <br /> In the event of a Delay,the Contractor shall take immediate steps to minimize the Delay or avoid further <br /> I <br /> Delay. The Contractor agrees it shall not make any Contract Claim or request for adjustment of Contract <br /> Time or Contract Sum based upon Delays for which it did not timely provide Notice to the Owner. <br /> 5.2.4.2 Bonuses <br /> I <br /> If the Contract Documents provide the Contractor with a bonus or other incentive for early completion of <br /> a milestone or other completion point, Contractor assumes the risk of Delays caused wholly or partially <br /> by third parties. Owner shall not pay any bonus that Contractor would have achieved but for any and all <br /> I <br /> Delays caused in whole or in part by a third party. By way of example only, the Contractor bears the risk <br /> of utility companies' failure to locate underground utilities accurately and the Contractor bears the risk of <br /> timely asking for the marking of the location of underground utilities. <br /> 1 5.3. SUSPENSION PROCEDURES <br /> The Owner may, at its convenience and at any time and without cause,suspend all or any part of the <br /> ' Work by notice in writing to the Contractor. The Work shall be resumed by the Contractor within five (5) <br /> days after receiving written notice from the Owner to do so. The Contractor will be allowed an increase <br /> I <br /> 00 7200 - 17 GENERAL CONDITIONS <br />