Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> User Testing SOW <br /> Everett, WA ENGAGE <br /> Staff Meetings That Will Take Place During and After User Testing: <br /> • User testing introduction and planning meeting <br /> • Pilot test <br /> o Must be completed at least 1 weeks before user testing begins <br /> • Post engagement findings presentation <br /> o Will take place during the week following onsite user testing <br /> Deliverables Resulting from User Testing <br /> 2 Rounds of User Testing for both In-Person and Virtual Tests <br /> • In person user testing <br /> o Will take place in a one on one format with each test participant and the CivicPlus user <br /> testing expert. <br /> o Up to 4 user tests will take place each day during City business hours <br /> o Each user test will last up to one hour and will feature 20 questions for the test subject <br /> to work through in that time. <br /> • Virtual user testing <br /> o The first round of virtual user testing will open 48 hours before the first onsite user test <br /> begins and will close at 3 pm during day one of onsite user testing. <br /> o The second round of virtual user testing will open at 9 am during the second day of <br /> onsite user testing and will close 24 hours after it opens. <br /> o Each user test will feature 10 questions for the online participant to answer.Virtual tests <br /> will utilize the same test questions as the online test but will be spilt into A groups and B <br /> groups of questions. <br /> 2 Rounds of Site Corrections <br /> • The user testing expert will complete two rounds site corrections to address content and <br /> navigation issues uncovered by the in-person and virtual user tests. CivicPlus uses a minimum <br /> success criterion to determine which content and navigation will require changes and retesting. <br /> o The first round of site corrects will be tested and reevaluated in the second round of <br /> user testing. <br /> 1 User Testing Report <br /> • CivicPlus will provide question by question, round by round, key statistics in an organized report <br /> that will be presented to the City's Core Team in the week following the user testing <br /> engagement. <br /> City of Everett Responsibilities <br /> • Select, schedule, and coordinate user testing participants for in-person and virtual user testing <br /> as determined by the schedule presented in the user testing introduction and planning meeting. <br /> • Provide a quiet room for onsite user testing to take place during business hours. <br /> • Send links from the user testing expert to the appropriate test participants <br /> 302 S.4th Street I Manhattan, KS 66502 1888.228.2233 I www.civicplus.com <br /> Page 12 p <br /> Civic Plus 2019 <br />