Laserfiche WebLink
OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> She lon Property Owner Name Erwin Arlantico <br /> Project Address: 111 E Beech St [ Parcel# <br /> City:Everett State:WA ZIP:98203 <br /> Day Phone. (425)308-9226 <br /> ...;....:.. <br /> Contractor Name A&R SOlar <br /> Contractor License#: RSOLAS*903JM <br /> Contractor Day Phone: 206-707-9937 <br /> PV system description Installing an 8.4kW Photovoltaic System on the roof. <br /> (include manufacturer (28) Itek Energy 300W <br /> and model#of PV (14) Blue Frog YC500A-MIW <br /> modules and <br /> inverters): <br /> ()Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PM system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detacheft accessory structure that <br /> 'is:code compliant to setbacks and height,or code allows expansion of'tionconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by f <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such as a single layer of composition shingles, <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.2] <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to E 0 <br /> administer the electrical code. [IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended <br /> by WA State. [IRC M2302.2] .. E. <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per <br /> the manufacturer's specifications. [IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] ! 1 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] <br /> Enter total dead load of system(lbs/ft2): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the ri <br /> roofing to which they are affixed. [IRC M2302.2.1(4)] <br />