My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3412 BELL AVE 2019-01-17
>
Address Records
>
BELL AVE
>
3412
>
3412 BELL AVE 2019-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 1:23:49 PM
Creation date
1/17/2019 1:23:48 PM
Metadata
Fields
Template:
Address Document
Street Name
BELL AVE
Street Number
3412
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICIORKS PERMIT <br /> Mate Applied: 9/13/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1809-020 <br /> 3200 Cedar Street,2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $85.00 <br /> 1 3 SFP 2010 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BAILEY ALFORD SEAN & KIMBERLY D ALL CONCRETE SURFACES, LLC <br /> 3412 BELL ST 22917 15TH AVE SE <br /> EVERETT, WA, 98201 BOTHELL, WA, 98021 <br /> PHONE: PHONE: 4258259911 <br /> TAX PARCEL ID#: 00561900203000 SITE ADDRESS: 3412 BELL ST <br /> DESCRIPTION: REPLACING EXISTING CONCRETE DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 09/13/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. See the <br /> attached handout for phone number and online instructions to Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to <br /> request a Final for this permit when all items have been completed. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expense .,thegii ,ever <br /> requires use of the right-of-way for municipal purposes. re <br /> Public Works Permit Fee Breakdown: <br /> Paving (1617SF) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 `; rrlc <br /> +- r...4 <br /> I'il <br /> City of EverettOlfcial Use Only ACKNOWLEDGE 's T OF CONDITIONS E8 <br /> The undersigned owner/applicant -by agrees to hold and sgle <br /> harmless the City of Everett frog .. alid. it ims for damag ,costs, <br /> 9 ! /� expenses,or causes of action tl el erg cause of installation and <br /> / _ f maintenance of the improveme o prof-way use htto applied <br /> Approved for Con ruction (Public Works) Date for and further agrees to remove same upon notice frorar iJcLity and to <br /> replace public property damaged thereby. L <br /> FINAL INSPECTION Date /3 1 <br /> Approved as Constructed (PW Inspector) S' nature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> -. Pb-' <br />
The URL can be used to link to this page
Your browser does not support the video tag.