Laserfiche WebLink
a <br /> BLOWER TEST, A / <br /> il IP ,. <br /> House address or lot#: 51V1 44,t,i,/,?, , ,,4,,,,t. ,t13r#,11,0,...,21 <br /> , <br /> ConditionedFloor Area: it/16F . - <br /> Duct tester location: N/A <br /> • Pressure tap location: N/A <br /> • Ring(if applicable): Open 0 1 kr 2 0 3 0 <br /> At Rough-in or.Post Construction <br /> Ilia' <br /> UMW/ Oils <br /> fillIN/Mitaiiititairis immiiimmilm <br /> . . <br /> Air Leakage testing calculator (Blower Door Test) <br /> - . Conditioned Floor Area: /iiite, f.. Calculated Volume (cubic feet) <br /> Ceiling Hieght (ft) 1 6' ,/ 433 .0. <br /> calculated Test <br /> Standard Tested CFM50 . <br /> Result(ACH50) <br /> 5.(1AcH. i,,,_, ,p, ),z CO0 •3 7 3 <br /> ._:,, -, 20 c. 3, <br /> 50 (CFMso X • (-3 <br /> 60+conditioned Volume) -37 3 20 3 7 Cc.‘N‘•••'''. <br /> =•izassed <br /> Glossary ' --' Failed <br /> Rough-In: After installation of the complete air distribution system but before installation of insulation and <br /> sheet i-ock.-Alictvvs for access to all ductseams and connections for re-evaluation of seal integrity if standard <br /> is not met in intitial test. . . <br /> Post Construction: At or near final inspection. The home must be complete enough to pressurize the home <br /> to 25 pa. - <br /> Total Leakage: Aggregation of the entire systems duct leakage in a duct test. <br /> Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. <br /> Pascal(pa): Unit of pressure . <br /> CFA: Conditioned floor area-in square feet LR Drywall Systems, Inc. <br /> CF1t#1125: Cubic feet per minute of air leakage at 25 pascals of pressure 7417 W Bostian Road. <br /> CFhfi .ctiCubic feet per minute of air leakage at 50 pascals of pressure Wdddldville'INA 98072 <br /> . 425A•81-8485 <br /> Conditioned Volume: Volumeof conditioned space-(CFA X ceiling hieght) LRDrInNall.corn <br /> ACH50: Air changes per hour at 50 pascals of pressure <br /> Termaine e <br /> .,„ <br /> -- _ <br />