My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5831 HIGHWAY PL 2019-01-18
>
Address Records
>
HIGHWAY PL
>
5831
>
5831 HIGHWAY PL 2019-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 8:55:41 AM
Creation date
1/18/2019 8:55:37 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5831
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLOWER DOOR TEST ' m, 044,4 <br /> House address or lot#: 565/ <br /> Conditioned Floor Area: ' , /75 vF ` t/i ,`7L /7 <br /> Duct tester location: N/A <br /> Pressure tap location: N/A <br /> Ring (if applicable): Open 0 1 kr 2 0 3 0 <br /> At Rough-1n or Post Construction <br /> 1.111 <br /> 117 <br /> 1111111111111a1.111111111111111111111111111 , <br /> Air Leakage testing Calculator (Blower Door Test) <br /> • Conditioned Floor Area: /,175,s, Calculated Volume (cubic feet) <br /> Ceiling Hieght (ft) 8! !Q 5",3o <br /> Standard Tested CFM50 Calculated Test <br /> c Result(ACI-150) , <br /> <5.0 ACHsfl (CFM50X 7a� x �' F d JD� <br /> Li O -- - p, <br /> 60=conditioned Volume) g V "� 3 .d <br /> Cpassed <br /> Glossary T Failed <br /> Rough-in: After installation of the complete air distribution system but before installation of insulation and <br /> sheet rock. Allo.ws for access to all duct seams and connections for re-evaluation of seal integrity if standard <br /> is not met in intitial test. <br /> Post Construction: At or near final inspection. The home must be complete enough to pressurize the home <br /> to 25 pa. <br /> Total Leakage: Aggregation of the entire systems duct leakage in a duct test. <br /> Leakage to-Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. <br /> Pascal(pa) Unit of pressure <br /> CFA: Conditioned floor area-in square feet LR Drywall Systems, Inc. <br /> CFMzs: Cubic feet per minute of air leakage at 25 pascals of pressure 7417 W Bosstian'Road <br /> CFMS0: Cubic feet per minute of air leakage at 50 pascals of pressure Woodinville, WA 98072 <br /> 425-481-8485 <br /> - Conditioned Volume: Volume of conditioned space(CFA X ceiling hiegh-t) LRDrywaiLconl <br /> ACHsa: Air changes per hour at 50 pascals of pressure <br /> i <br /> TeEmaine Keith <br /> W <br /> \i <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.