Laserfiche WebLink
INSPECTION REPORT <br /> /. "-- :_ Date9 to`i ? Permit: U/( QO Q 5 <br /> Contractor: 2_ <br /> Owner: ,'hnie1 Ku)a5Q <br /> Site Address: (58 3' - l \riwa <br /> y ---0,. <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final KMedical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Fi al ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: I , <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION 111 <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> smS e \\ �k Se ar u)6ec rae <br /> 1 <br /> izy <br /> p1 <br /> Inspect \ -- Date: 6 <br /> EIR(10/06) ` DATABAR,INC. <br />