Laserfiche WebLink
INSPECTION REPORT <br /> Date co --17--q Permit: _Ci.-) l i e 1 ^ C7e, <br /> Contractor: <br /> "� �� Owner: -- -- ------------- <br /> 3°1 e ' <br /> Site Address: 7 3 � pcv- /� /L._j i _ __,64,, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL_ PLUMBING <br /> ❑Temp Service ❑UFER groundroundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ,,01ough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ! CORRECTION REQUESTED <br /> El <br /> ❑ OK FOR C.O. rjj VIOLATION <br /> ❑ UNABLE TO PERFOR INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notic required <br /> . o CJS ilk f A_ c=" <br /> C r 1 <br /> iif <br /> Inspector: Date: <br /> 6 ,.2, , - (7 <br /> EIR(10/06) DA AGAR,INC. <br />