Laserfiche WebLink
• <br /> Project: Grand Avenue Park Bridge <br /> Change Order No.: 8 <br /> Change Order Effective Date: 2-27-2018 <br /> CONTRACTOR <br /> By (/4024 Date: November 13, 2016 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> L08 Lijhtinr on POE Property—The Port of Everett (POE) reviewed the four street lights (L08)to be <br /> installed on their property per submittal 058.A and requested taller lights (14' to 18') and higher <br /> wattage to match the similar lights located to the north of the project. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> New Bid Item—A306—L08 Revisions per POE request <br /> Measurement and Payment <br /> Measurement and Payment for the L08 lighting remain the same. This LS payment is for the <br /> additional cost to provide the lights at the request of the POE. <br /> ATTACHMENTS(Seven Additional Page) <br /> • New Bid Item <br /> • ICI COP-010: LO8 Luminaire Revisions, dated 8/3/18 <br /> Page 3 of 3 <br />