My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:50:48 AM
Creation date
1/23/2019 11:50:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
8
Tracking Number
0000801
Total Compensation
$13,830,467.80
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Project: Grand Avenue Park Bridge <br /> Change Order No.: 8 <br /> Change Order Effective Date: 2-27-2018 <br /> CONTRACTOR <br /> By (/4024 Date: November 13, 2016 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> L08 Lijhtinr on POE Property—The Port of Everett (POE) reviewed the four street lights (L08)to be <br /> installed on their property per submittal 058.A and requested taller lights (14' to 18') and higher <br /> wattage to match the similar lights located to the north of the project. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> New Bid Item—A306—L08 Revisions per POE request <br /> Measurement and Payment <br /> Measurement and Payment for the L08 lighting remain the same. This LS payment is for the <br /> additional cost to provide the lights at the request of the POE. <br /> ATTACHMENTS(Seven Additional Page) <br /> • New Bid Item <br /> • ICI COP-010: LO8 Luminaire Revisions, dated 8/3/18 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.