Laserfiche WebLink
COP 1 <br /> ELECTRIC WEST, INC. <br /> CHANGE ORDER PROPOSAL <br /> Broadway Bridge <br /> ICI <br /> Description: Changes to lighting.Custom paint color for L03 and change L08 pole length to 18 feet. <br /> REVISED to add the higher wattage L08 fixture. <br /> 1 DIRECT LABOR <br /> Job <br /> Classification Wage Rate Hours Cost <br /> Foreman 80.34 1 $80.34 <br /> Electrician 75.25 4 $301.00 <br /> Subtotal $381.34 <br /> Allowable mark up 29% $57.20 <br /> Total Labor Cost $438.54 <br /> 2 MATERIALS <br /> Description Quantity Units Unit Price Cost <br /> Graybar 1 Lot $3,250.00 $3,250.00 <br /> Graybar L08 1 Lot $1,084.00 $1,084.00 <br /> 0 Feet $0.00 $0.00 <br /> shipping 0 $0.00 $0.00 <br /> Use Tax 9.70% $420.40 <br /> Allowable mark up 21% $998.42 <br /> Total Material Cost $5,752.82 <br /> 3 EQUIPMENT Proposed <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> Overhead &Profit 21% $0.00 <br /> Total Cost of Equipment $0.00 <br /> 4 SERVICES <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> Allowable mark up 21% $0.00 <br /> Total Cost of Services $0.00 <br /> 5 FORCE ACCOUNT MOBILIZATION $0.00 <br /> 6 SUBCONTRACTORS $0.00 <br /> 7 CONTRACTOR MARK UP ON SUBCONTRACTORS 12% $0.00 <br /> 8 ADDITIONAL CONTRACT DAYS REQUIRED 0 <br /> TOTAL COST OF PROPOSED CHANGE $6,191.36 <br /> Electric West reserves all contractual and legal rights to modify or supplement this Change Order to reflect <br /> additional cost or schedule impacts,and nothing herein shall be construed as a waiver of such rights. <br /> 6/15/2018 <br />