My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:50:48 AM
Creation date
1/23/2019 11:50:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
8
Tracking Number
0000801
Total Compensation
$13,830,467.80
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COP 1 <br /> ELECTRIC WEST, INC. <br /> CHANGE ORDER PROPOSAL <br /> Broadway Bridge <br /> ICI <br /> Description: Changes to lighting.Custom paint color for L03 and change L08 pole length to 18 feet. <br /> REVISED to add the higher wattage L08 fixture. <br /> 1 DIRECT LABOR <br /> Job <br /> Classification Wage Rate Hours Cost <br /> Foreman 80.34 1 $80.34 <br /> Electrician 75.25 4 $301.00 <br /> Subtotal $381.34 <br /> Allowable mark up 29% $57.20 <br /> Total Labor Cost $438.54 <br /> 2 MATERIALS <br /> Description Quantity Units Unit Price Cost <br /> Graybar 1 Lot $3,250.00 $3,250.00 <br /> Graybar L08 1 Lot $1,084.00 $1,084.00 <br /> 0 Feet $0.00 $0.00 <br /> shipping 0 $0.00 $0.00 <br /> Use Tax 9.70% $420.40 <br /> Allowable mark up 21% $998.42 <br /> Total Material Cost $5,752.82 <br /> 3 EQUIPMENT Proposed <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> Overhead &Profit 21% $0.00 <br /> Total Cost of Equipment $0.00 <br /> 4 SERVICES <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> Allowable mark up 21% $0.00 <br /> Total Cost of Services $0.00 <br /> 5 FORCE ACCOUNT MOBILIZATION $0.00 <br /> 6 SUBCONTRACTORS $0.00 <br /> 7 CONTRACTOR MARK UP ON SUBCONTRACTORS 12% $0.00 <br /> 8 ADDITIONAL CONTRACT DAYS REQUIRED 0 <br /> TOTAL COST OF PROPOSED CHANGE $6,191.36 <br /> Electric West reserves all contractual and legal rights to modify or supplement this Change Order to reflect <br /> additional cost or schedule impacts,and nothing herein shall be construed as a waiver of such rights. <br /> 6/15/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.