Laserfiche WebLink
Izaak Fox <br /> From: Bruno Padilla <bruno@electric-west.com> <br /> Sent: Wednesday,July 25, 2018 3:46 PM <br /> To: Izaak Fox; Michelle Padilla <br /> Cc: Julie Chonzena <br /> Subject: GAPB - LO8 <br /> Izaak, <br /> I don't have an invoice for the changed L08 fixtures only a price from my vendor and it was sent in an email. I won't see <br /> an invoice until we receive the fixtures and I haven't released them as I am waiting on a CO. Maybe Graybar's email will <br /> serve the purpose? I didn't think this was being treated as force account work? <br /> RE: Grand Ave Park Bridge 1.08 <br /> Joshua Habersetzer [Joshua.Habersetzer@graybar.com] <br /> Thu 6/14/2018 3.59 PM <br /> Bruno Pada <br /> Jessie Hofner <br /> Yes if you want to only increase 4 of the fixtures to the higher wattage you will be looking at an adder of$1084 for a <br /> I will be out of the office 6/18 through 6/22 <br /> Joshua E.Habersetzer I <br /> !, l foshua.habersetzer aravrbar corn <br /> y;t:3• <br /> GraWbtaR <br /> Bruno Padilla <br /> Electric West <br /> 360 419-9378 <br /> 1 <br />