My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:53:50 AM
Creation date
1/23/2019 11:53:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
9
Tracking Number
0000801
Total Compensation
$13,855,462.69
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> 101 IST <br /> CONSTRUCNTERWETION <br /> INC. <br /> June 29th,2018 COP 006/RFP 004 <br /> Ken Kettel,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: COP 006: Added Drip Holes Per RFP 004 <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested to add drip holes to the bridge per Request For Proposal (RFP) 004 as update June 5th, <br /> 2018. <br /> Interwest proposes to provide additional labor,equipment,and materials as detailed below to <br /> address the added work requested: <br /> • Provide additional drip holes on the east side of the bottom chord joints per RFP detail <br /> dated 5/29/2018. <br /> Interwest's proposed price includes the following clarifications: <br /> • This proposal does not address the added 33 x 4 box beam. <br /> o Interwest is currently awaiting vendor pricing on the remaining portion of RFP <br /> 004 to add a 33 x 4 box beam and will submit that separately. Interwest requests <br /> that this proposal be evaluated and responded to at the City's earliest opportunity. <br /> Interwest proposes the following Pricing for these changed conditions: <br /> etri <br /> • Additional Drip Holes $ 3168-7th("Cl <br /> Sum <br /> TOTAL $ .;687T'Lump Sum <br /> 247.43 <br /> Interwest requests 0 additional Contract Days work to perform this work provided timely <br /> authorization is granted to avoid production delays with the bridge steel fabrication. <br /> Please do not hesitate to contact me if you wish to discuss this matter. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION,INC. <br /> Izaak Fox, P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: Cost Backup:TMF CCO 009 <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI 121 OF <br /> loft <br />
The URL can be used to link to this page
Your browser does not support the video tag.