My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:53:50 AM
Creation date
1/23/2019 11:53:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
9
Tracking Number
0000801
Total Compensation
$13,855,462.69
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERW <br /> CONSTRUCESTTION <br /> INC. <br /> June 29th,2018 COP 008 <br /> Ken Kettel,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: COP 008: Additional Steel Members in Utility Roof per RFI 171 <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested to add additional steel members to the Utility Room roof structure <br /> Interwest proposes to provide additional labor, equipment, and materials as detailed below to <br /> address the added work requested: <br /> • Provide additional steel members and anchorages per the response to RFI 171 and the <br /> City's GAPB SL REC-016 dated 4/23/2018. <br /> Interwest's proposed price includes the following clarifications: <br /> • Sales tax has been included on materials <br /> Interwest proposes the following Pricing for these changed conditions: <br /> • Additional Steel Members in Utility Roof $ 13,488.87 Lump Sum <br /> TOTAL $ 13,488.87 Lump Sum <br /> Interwest requests 1 additional Contract Day work to perform this work. <br /> Please do not hesitate to contact me if you wish to discuss this matter. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION,INC. <br /> 4JZ <br /> Izaak Fox, P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: Cost Backup:TMF CCO 006 <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI 121 OF <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.