My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshland Flood Control District 11/13/2018 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2018
>
Marshland Flood Control District 11/13/2018 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2019 9:55:58 AM
Creation date
1/24/2019 9:55:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshland Flood Control District
Approval Date
11/13/2018
Council Approval Date
10/31/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Hillside Runoff in Marshland Drainage Basin
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$30,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROVIDED, that during the 2018 Original Term Extension and the 2019 Original <br /> Term Extension, that approximately seventy-two and sixty-four hundredths percent <br /> (72.64%) of the District's Ditch, Pond and Canal Operating Costs will be allocable to <br /> sediment from Increased Hillside Runoff. <br /> Section 5 Subsection 7.2 "Anticipated Pump Plant O&M Operating Costs <br /> Attributable to Increased Hillside Runoff"of the Original Agreement last amended by Amendment <br /> 1, is amended to add the following: <br /> ALSO PROVIDED, that during the 2019 Original Term Extension, the parties <br /> agree that,for 2019,twenty-three and twenty hundredths percent(23.20%)of the District's <br /> Pump Plant O&M Operating Costs will be attributable to additional surface water flow that <br /> comes into the Marshland Drainage Basin from Increased Hillside Runoff. <br /> Section 6 Subsection 7.3 "Anticipated Pump Electricity Operating Costs Attributable <br /> to Increased Hillside Runoff", last amended by Amendment No. 1, is amended to add the <br /> following: <br /> ALSO PROVIDED, that during the 2019 Original Term Extension, the parties <br /> agree that,for 2019,twenty-three and twenty hundredths percent(23.20%)of the District's <br /> Pump Electricity Operating Costs are attributable to additional surface water flow that <br /> comes into the Marshland Drainage Basin from Increased Hillside Runoff <br /> Section 7 Subsection 9.3 "Amount of Increased Hillside Runoff Pump Plant Capital <br /> Improvement Fund Contribution," last amended by Amendment No. 1, is amended to add the <br /> following: <br /> ALSO PROVIDED, that during the 2019 Original Term Extension, the parties <br /> agree that,for 2019,twenty-three and twenty hundredths percent(23.20%)of the District's <br /> pump-related Operating Costs will be attributable to the additional surface water flow that <br /> comes into the Marshland Drainage Basin from Increased Hillside Runoff Accordingly, <br /> the parties agree it is appropriate for the calendar year 2019, to allocate responsibility for <br /> twenty-three and twenty hundredths percent (23.20%) of the annual Pump Plant Capital <br /> Improvement Fund Contribution to the Upland Area. Twenty-three and twenty hundredths <br /> percent (23.20%) of Forty-Four Thousand One Hundred Forty Six Dollars ($44,146) <br /> equals approximately Ten Thousand Two Hundred Forty Two Dollars ($10,242). This <br /> amount shall be referred to as the "Increased Hillside Runoff Pump Plant Capital <br /> Improvement Fund Contribution for 2019." <br /> Section 8 Subsection 9.4 "Amount of the County's Increased Hillside Runoff Pump <br /> Plant Capital Improvement Fund Contribution Payment," last amended by Amendment No. 1, is <br /> amended to add the following: <br /> ALSO PROVIDED, that during the 2019 Original Term Extension, the parties <br /> agree that the County's proportionate share of the Increased Hillside Runoff Pump Plant <br /> Capital Improvement Fund Contribution for 2019 shall be equal to sixty-nine percent <br /> AMENDMENT NO.2 TO INTERLOCAL AGREEMENT REGARDING <br /> INCREASED HILLSIDE RUNOFF IN THE MARSHLAND DRAINAGE <br /> BASIN DUE TO UPLAND DEVELOPMENT <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.