|
j
<br /> GENERAL NOTES ¢� ���.� ��
<br /> .��������
<br /> �� ���-�� h��,-�.
<br /> w�r� �-���,,����.
<br /> 1. INSTALL FLOORING AS PER MANUFACTURER'S INSTRUCTIONS. SEE DETAIL SHEETS FOR MORE .�� ����`'�'��`�
<br /> �� �-
<br /> INFORMATION ON TRANSITIONS AND BASE CONDITIONS. ���
<br /> ;�� t
<br /> ��� „
<br /> 2. FLOOR TILE IS TO BE INSTALL SUCH THAT WATER DOES NOT ACCUMULATE ON SURFACE. °��, ��
<br /> GENERAL CONTRACTOR IS TO VERIFY THAT SLAB DOES NOT HOLD WATER PRIOR TO SE7TING ' -�-�.- ,� �
<br /> FLOOR TILE."PONDING"WILL NOT BE ACCEPTED AFTER TILE IS INSTALLED. ������������
<br /> ��,����,
<br /> E��
<br /> 3. REFER TO FINISH SCHEDULE FOR MORE INFORMATION. o `_
<br /> 4. IT SHALL BE GENERAL CONTRACTORS RESPONSIBILITY TO VERIFY ALL QUANITIES BEFORE �
<br /> ORDERING OR INSTALLING FLOORING MATERIAL. 9330 BALBOAAVENUE
<br /> 5. ALL GROUT SHALL BE SEALED. SAN DIEGO,CA 92123
<br /> 0 2007 Jack in the Box Inc.
<br /> 6. REFER TO FLOORING LAYOUTAND FINISH SCHEDULE FOR SANITARY COVE BASE COLOR. These designs,drawings and specifications
<br /> are the property of Jack in the Box Inc
<br /> 7, CONTRAGTOR SHALL ORDER AND INSTALL FLOORING MATERIAL IN MANER AS SHOWN HERE IN. and sha��not be copied or reproduced
<br /> without its previous written consent.
<br /> 8. A MINIMUM 1%STOCK OF ALL TILE SIZES AND COLORS SHALL BE CONSIDERED ATTIC STOCK AND .
<br /> LEFT FOR OWNER AT UNIT LOCATION.
<br /> 9. IT IS THE RESPONSIBILITY OF CONTRACTOR TO VALIDATE FLOOR TILE SQUARE FOOTAGE PRIOR �
<br /> TO ORDERING MATERIAL. �
<br /> . SEE FINISH LE(I.D.DRAWINGS FOR INFORMATION ON INTERIOR FINISHES. INTERIOR DATES
<br /> ISHES E DE NATED BY; �
<br /> RELEASE:
<br /> � — — — — — — — — — — — — — —
<br /> P.M. URDATES: NIA
<br /> � � - - - - - - - - - -- �„�, ��� � / � / �
<br /> � � � � � / � / � / SUBMITTAL DATE:
<br /> �� / � � / / � � � /, � i �� I
<br /> 1:
<br /> � � � � � � � �� � � � � � % � 2: �
<br /> i / /, � � , � i � / � j � � 3: �
<br /> � ! ---��- ' / �-� -- � / � / � � I BID:
<br /> __---------------� --- -- // � / � // � / � � �
<br /> ______________________ � / � / / /, /,i / / � j � � CONSTRUCTION:
<br /> � ���������/�i
<br /> _ _--- � / � /� j � � � , � �; � REVISIONS
<br /> __--- , � / � i ' � //, / / / �
<br /> � -- ���i�l/i;�i� �������
<br /> r , , ��-y- ------- � / / / � � / � � � , /: � � /%, i � / / /,� i �
<br /> �T/���// / __-----� _--- . /-T T �/-l��/T T � -_- - �� . � � .� . � � . � � � / � � �. � � �
<br /> . � � � � �00 � �� �� � � � �/ 7' , � �
<br /> � � � � � � ROW "B" TILE REPEAT �
<br /> i �� � � �� „ � ' i , � ,� � � , / / / /, � _
<br /> � � � / � / 12 x 24" FIELD TILE GC-T1 ' � � ��� I / , � �
<br /> � � � � � � � i �j ' � ' / , � // ' i��i, /, � � �
<br /> �� �� I � � � � � � i � � � �� � �� �� �� � Q
<br /> � � � „ „ � I
<br /> ROW B TI E EPEAT � � � � � � � -- -_- / �
<br /> L R � � �� 12 x 24 FIELD TILE GGT3 � � �� � �� � � � � �
<br /> GGT3 12"x 24° FIELD TIL � � � � � � � / � � �
<br /> O � � � � � � � � � � � � � ��/ � / � / , '/i' i
<br /> //: / % i / , �
<br /> ; , � � , / � /,� � , � � . � � ,
<br /> oGGT1 12"x 24" FIELD TIL � � � � � � � � .
<br /> „ „ � -� � � ,: � � , �
<br /> � i � � � � �� � � � � � ROW B TILE REPEAT / � --�__-----� � � �
<br /> � 12"x 24" FIELD TILE GGT1 �� — `_
<br /> � � � � � � — -------- � �
<br /> � ROW "B" TILE REPEAT � � + �
<br /> GGT3 )2°X 24�� FIELD TIL � � / �� � � � " C-T3 � � �� 11668 REGISTERED
<br /> �� � 12 x 24 FIELD TILE G
<br /> O � � � ( � � � � I ARCHITECT
<br /> � ; � � �/� � � � � � I i �
<br /> �GGT1 12°X 24" FIELD TIL � � ( � CHAD SUCHTER
<br /> � � � �� ( ���, ������� I STATE OF WASHINGTON
<br /> � � � I � � � / t0`I_ �
<br /> � � � � i � � � � i�� '
<br /> � �� � �� � � ���,�.,,.�.W. �� � � � �
<br /> � � j ��� �� i ��� , � ��� . . `-
<br /> � � � �� � ��� � /, � � �� � � � �� � � ��
<br /> � �o� / E
<br /> I � �I ���� � ' � �� � ,� '� / /% i10� � � �
<br /> i � � 111 � � �
<br /> I � � �� � �� �� �� HIS DRAWWG DEPICTS IDEAS, DESIGNS,
<br /> � � � � � � �i� � � �� � � � � LANS,AND DETAILS WHICH ARE
<br /> � ��� � � / � � /�� � � �� R�HT�ECTURE.�THEY WERE CREATED,
<br /> TILE LAYOUT NOTES � � � � � �� � ESIGNED,AND DEVELOPED FOR USE
<br /> I � �� � /j� � � �� � OLELY IN CONNECTION WITH THE
<br /> 1. ACCENT TILES SHALL BE 6-0' O.C.SET I '1 � � RO.IECT SHOWN ON THIS DRAWING �
<br /> � IN ROWS AS NOTED. I �� I � �� � � � /, /� � � ��j ND MAY BE USED ONLY WITH THE •
<br /> � � � � � � ERMISSION OF SLICHTER�UGRIN
<br /> i
<br /> � � RCHITECTURE. NO TRANSFER OF ANY
<br /> 2. ATTHE WORK POINT,THE FIELD AND � � � � �i� � IGHTS THERETO IS INTENDED OR
<br /> ACCENT COLOR TO ARE REVERSED TO � � RANTED BY DELIVERY HEREOF,AND _
<br /> ACHIEVE PATTERN. � � � i� XCEPT UPON THE WRITTEN PERMISSION
<br /> � � � � � i F SLICHTER�UGRIN ARCHITECTURE. THIS
<br /> .
<br /> I ————— ———— — — —— ��— —— — -�� � �� � NY WAY FOR�PROJ CTS��OTHE�R HAN �
<br /> HE SPECIFIED PROJECT.
<br /> �� ��
<br /> / I�__.
<br /> � _
<br /> SITE fNFORMATION
<br /> MK TYPE; MK5E FMD
<br /> JIB#: 8423
<br /> ���j ��'����� ADDRESS:
<br /> ��n 2106 EVERETT AVENUE
<br /> EVERETT, WA 9$201
<br /> DRAWN BY: ANTONE STEELE
<br /> ( PROJECT#: 17015
<br /> L�_--
<br /> SCALE: 1/4" = 1'-0"
<br /> F�ooR
<br /> LAYOUT � .
<br /> FLOOR FINISH PLAN �-
<br /> SCALE: 1/4" = 1'-0"
<br /> ID1 . 1
<br />
|