My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
709 N BROADWAY 2019-01-24
>
Address Records
>
N BROADWAY
>
709
>
709 N BROADWAY 2019-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2019 12:04:23 PM
Creation date
1/24/2019 12:04:22 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
709
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4177 ENGINEERING <br /> PUBLIC SERVICES DEPARTMENT <br /> April 27, 2018 <br /> Matthew D. Todd, PE • <br /> mtodd@entekhvac.com <br /> Entek Corp <br /> 1021 Columbia Blvd <br /> Longview, WA 98632 <br /> RE: Owner: WSDOT <br /> Job Address: 709 N Broadway Ave <br /> Plan Check Number: M1804-042 <br /> Dear Mr. Todd, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. These comments address building issues only. Additional <br /> revisions or additions may be required by other departments (such as Building Architectural, Public <br /> Works, Planning, or Fire). All references refer to the 2015 International Building Code (IBC), the <br /> 2015 International Existing Building Code (IEBC), the 2015 International Fire Code (IFC), the 2015 <br /> International Mechanical Code (IMC), and the 2015 Washington State Energy Code (WSEC), as <br /> amended by the State of Washington and adopted by the City of Everett. The current IBC <br /> referenced standard for accessible design is the 2009 "Accessible and Usable Buildings and <br /> Facilities" (ICC/ANSI A117.1). Federal ADA regulations and standards may be more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction documents <br /> reflecting the corrections requested. All revisions require the person delivering the <br /> drawings to replace the revisions into the two sets here at our offices. For significant <br /> revisions,or if the revisions are coming directly from a document printing facility, <br /> please make arrangements with them to print and deliver two replacement sets. <br /> Structural <br /> 1. It appears that new make-up air unit and exhaust fans are being provided at the roof. <br /> Please provide design calculations verifying that the existing structure can support the <br /> weight of these proposed items per IEBC 2015 Sec. 707. <br /> 2. Please provide calculations and details for the anchorage of these roof top items. Please <br /> refer to ASCE 7-10 Chapter 13 for seismic load requirements of non-structural components <br /> or Chapter 30 for wind load requirements, whichever demand governs. <br /> of 2, <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8857 <br />
The URL can be used to link to this page
Your browser does not support the video tag.