Laserfiche WebLink
INSPECTION REPORT <br /> '/N.4,fr-- v- <br /> DateLI 6 _ Permit: Mil —0_2_1 <br /> vr <br /> Contractor: ApC.orl -re <br /> " ° Owner: SVC <br /> Site Address: aQoi p,.} t) ,tk)ay <br /> TYPE OF INSPECTION REQUEST <br /> EB� <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation IF;.i1 echanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑ efrigeration ❑Rough in <br /> II]Roof drains ❑Building Final .6ras Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 'Ll.)--c 7 S- 7 SL_— _ <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED I <br /> ElOK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 41 1/0 A. lkft ---imAiiii44.•- k ILL ‘. Ali <br /> gig- &VI 1 i aL t tock <br /> A. <br /> 7ir_'' tg N4-04--- • <br /> rreA553-OrQ- --- a,& C <br /> :."- <br /> Inspector: 2)4P Date: .23---125/ <br /> EIR(10/06) DATABAR,INC. <br />