Laserfiche WebLink
INSPECTION REPORT <br /> _ Date 1//G�� Permit: F/7//-/q/ <br /> `' Contractor: wfinke <br /> Owner: .0 <br /> 2 C _ <br /> Site Address: t . <br /> TYPE OF INSPECTION R QUESTED <br /> CTRICAL BUILDING MECHANICAL PLUMBING <br /> rvice ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In LI Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> •Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> IL ectrical Final ❑Shear Nailing GAS PIPE <br /> SI E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> •Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT ER OR CONSULTATION:"_2O o. _355• 5S_ <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERM <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED .� <br /> t <br /> OK FOR C.O. ElVIOLATION i . <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> fes_ <br /> Inspector: Date: / /7 <br /> EIR(10/06) TABAR,INC. <br />